Bangladesh · plan · unnumbered (IEPMP 2023)

Integrated Energy and Power Master Plan (IEPMP) 2023

Integrated Energy and Power Master Plan (IEPMP) 2023

in force unverified

Summary

Long-term plan for the energy and power sector up to 2050, prepared with Japanese assistance, covering demand, generation mix, fuels and grid. The interim government has prepared a draft 25-year Energy and Power Sector Master Plan for 2026-2050 intended to succeed it.

Not yet verified. This entry has not been fully checked against the official text. Confirm the status and links before relying on it.

Reviewer notes: Scouted from desk research (low confidence). Approved in 2023; one source says published 2023-11-27 (not confirmed). Status of the draft successor plan (Daily Star, Financial Express, CPD 2025-26) unclear; if adopted, mark this row replaced. JICA role from general knowledge.

History

No amendment or revocation links are recorded for this rule yet.

Related rules in Bangladesh

Change log

  1. Added to the tracker.

Cite this entry

Integrated Energy and Power Master Plan 2023, “Integrated Energy and Power Master Plan (IEPMP) 2023”. Ministry of Power, Energy and Mineral Resources, Bangladesh, signed —. In: Power Transformation Lab Policy Tracker, status checked 19 Nov 2026. https://power-lab.github.io/policy-tracker/rules/bd-plan-2023-iepmp/