China · ministerial regulation · 国能发新能规〔2025〕7号

Notice on Issuing the Measures for the Administration of Development and Construction of Distributed Photovoltaic Power Generation

国家能源局关于印发《分布式光伏发电开发建设管理办法》的通知

in force unverified

Summary

Replaces the 2013 interim measures on distributed PV and classifies projects as residential (individual), residential (non-individual), general commercial and industrial, and large commercial and industrial. It sets filing (备案) rules, grid-connection procedures and registration after connection; projects filed before issue and connected before 2025-05-01 keep the previous policy.

Not yet verified. This entry has not been fully checked against the official text. Confirm the status and links before relying on it.

Reviewer notes: Scouted from desk research (high confidence). Issued as a normative document (规范性文件) of the NEA, mapped to ministerial regulation; valid five years per secondary sources. Xinhua gives 2025-01-23 as the issue date, gov.cn and local copies 2025-01-17: check the date on the official text. Revokes 国能新能〔2013〕433号 (not recorded).

History

No amendment or revocation links are recorded for this rule yet.

Change log

  1. Added to the tracker.

Cite this entry

Distributed PV Measures 2025, “Notice on Issuing the Measures for the Administration of Development and Construction of Distributed Photovoltaic Power Generation”. National Energy Administration, China, signed 17 Jan 2025. In: Power Transformation Lab Policy Tracker, status checked 19 Nov 2026. https://power-lab.github.io/policy-tracker/rules/cn-mr-nea-2025-7/