India · decision · unnumbered (Union Cabinet approval)

National Green Hydrogen Mission

National Green Hydrogen Mission

in force unverified non-binding

Summary

Mission approved with an outlay of Rs 19,744 crore to develop green hydrogen production, use and export, targeting at least 5 MMT a year of production capacity by 2030. Its SIGHT programme (Rs 17,490 crore) provides separate incentives for domestic electrolyser manufacturing and for green hydrogen production.

Not yet verified. This entry has not been fully checked against the official text. Confirm the status and links before relying on it.

Reviewer notes: Scouted from desk research (high confidence). Approval date and outlay confirmed by PIB release 2039091 (2024-07-24). SIGHT allocation from PM India summary. The SIGHT scheme guidelines (MNRE) set the electrolyser incentive terms and are not recorded; add them if the manufacturing-incentive topic needs instrument-level rows.

History

No amendment or revocation links are recorded for this rule yet.

Related rules in India

Change log

  1. Added to the tracker.

Cite this entry

National Green Hydrogen Mission, “National Green Hydrogen Mission”. Union Cabinet; Ministry of New and Renewable Energy, India, signed 4 Jan 2023. In: Power Transformation Lab Policy Tracker, status checked 19 Nov 2026. https://power-lab.github.io/policy-tracker/rules/in-cab-2023-nghm/