India · plan · unnumbered (National Electricity Plan Vol. I Generation 2022-32)

National Electricity Plan (Volume I) Generation, 2022-32

National Electricity Plan (Volume I) Generation, 2022-32

in force unverified non-binding

Summary

Plan prepared by the Central Electricity Authority under section 3(4) of the Electricity Act reviewing 2017-22 and setting a detailed plan for 2022-27 and a prospective plan for 2027-32. It projects installed capacity of about 609.6 GW in 2026-27 and 900.4 GW in 2031-32.

Not yet verified. This entry has not been fully checked against the official text. Confirm the status and links before relying on it.

Reviewer notes: Scouted from desk research (high confidence). PIB release of 2023-05-31 states the plan was notified and released via e-Gazette that day; one secondary source dates the CEA notification 2023-05-18 (date_signed left empty). CEA's gazette PDF link returned 404. Capacity figures from trade press summaries of the plan. Volume II (Transmission) was notified in October 2024 per PIB 2241170 and is not recorded. The plan also projects coal capacity additions and retirements; reviewers may add coal-phase-out if relevant.

History

No amendment or revocation links are recorded for this rule yet.

Implementation

This rule implements Electricity Act 2003.

Related rules in India

Change log

  1. Added to the tracker.

Cite this entry

National Electricity Plan 2022-32 (Generation), “National Electricity Plan (Volume I) Generation, 2022-32”. Central Electricity Authority, India, signed —. In: Power Transformation Lab Policy Tracker, status checked 19 Nov 2026. https://power-lab.github.io/policy-tracker/rules/in-plan-cea-2023-nep/