Pakistan · plan · unnumbered (IGCEP 2025-35 / ISP 2025-35)

Indicative Generation Capacity Expansion Plan 2025-35 (Integrated System Plan 2025-35)

Indicative Generation Capacity Expansion Plan 2025-35 (Integrated System Plan 2025-35)

in force unverified

Summary

Least-cost generation expansion plan prepared by the system operator for the 2025-2035 period and filed with NEPRA. Secondary reports say NEPRA approved the Integrated System Plan 2025-35 comprising the revised recommended case of IGCEP 2025, excluding battery storage and a K-Electric transmission line in 2028.

Not yet verified. This entry has not been fully checked against the official text. Confirm the status and links before relying on it.

Reviewer notes: Scouted from desk research (low confidence). Linked file is the August 2025 filing (R2) on NEPRA's site; NEPRA posted addenda to ISP 2025-35 in July 2026. Approval date and decision not found; earlier IGCEP 2022-31 not recorded. Confirm status and date from the NEPRA decision.

History

No amendment or revocation links are recorded for this rule yet.

Related rules in Pakistan

Change log

  1. Added to the tracker.

Cite this entry

IGCEP 2025-35 / Integrated System Plan, “Indicative Generation Capacity Expansion Plan 2025-35 (Integrated System Plan 2025-35)”. Independent System and Market Operator (ISMO); approved by NEPRA, Pakistan, signed —. In: Power Transformation Lab Policy Tracker, status checked 19 Nov 2026. https://power-lab.github.io/policy-tracker/rules/pk-plan-2026-isp/