Pakistan · plan · unnumbered (IGCEP 2025-35 / ISP 2025-35)
Indicative Generation Capacity Expansion Plan 2025-35 (Integrated System Plan 2025-35)
Indicative Generation Capacity Expansion Plan 2025-35 (Integrated System Plan 2025-35)
Summary
Least-cost generation expansion plan prepared by the system operator for the 2025-2035 period and filed with NEPRA. Secondary reports say NEPRA approved the Integrated System Plan 2025-35 comprising the revised recommended case of IGCEP 2025, excluding battery storage and a K-Electric transmission line in 2028.
Reviewer notes: Scouted from desk research (low confidence). Linked file is the August 2025 filing (R2) on NEPRA's site; NEPRA posted addenda to ISP 2025-35 in July 2026. Approval date and decision not found; earlier IGCEP 2022-31 not recorded. Confirm status and date from the NEPRA decision.
History
No amendment or revocation links are recorded for this rule yet.
Related rules in Pakistan
Change log
-
Added to the tracker.
Cite this entry
IGCEP 2025-35 / Integrated System Plan, “Indicative Generation Capacity Expansion Plan 2025-35 (Integrated System Plan 2025-35)”. Independent System and Market Operator (ISMO); approved by NEPRA, Pakistan, signed —. In: Power Transformation Lab Policy Tracker, status checked 19 Nov 2026. https://power-lab.github.io/policy-tracker/rules/pk-plan-2026-isp/