Indonesia · plan · (number to confirm)
MEMR Decision approving PLN's RUPTL 2025-2034
Keputusan Menteri ESDM tentang Pengesahan Rencana Usaha Penyediaan Tenaga Listrik PT PLN (Persero) Tahun 2025 sampai dengan Tahun 2034
Summary
Approves PLN's supply plan to 2034, with about 69 GW of new capacity of which most is renewable or storage, alongside new gas and some coal.
Reviewer notes: Decision number and capacity figures need checking against the decision. Seed row drafted from secondary knowledge; check every field against the official text.
History
All instruments linked to this one by amendment, revocation or partial override, in order of signature. Select an instrument to open its entry.
revokes or replaces amends overrides in part in force amended pending draft replaced revoked expired
-
MEMR Decision approving PLN's RUPTL 2021-2030
-
RUPTL 2025–2034 (this rule) May 2025 in forceMEMR Decision approving PLN's RUPTL 2025-2034Revokes RUPTL 2021–2030.
Change log
-
Added to the tracker.
Cite this entry
RUPTL 2025–2034, “MEMR Decision approving PLN's RUPTL 2025-2034”. Ministry of Energy and Mineral Resources (ESDM), Indonesia, signed May 2025. In: Power Transformation Lab Policy Tracker, status checked 3 Nov 2026. https://power-lab.github.io/policy-tracker/rules/id-kepmen-esdm-2025-ruptl/