Philippines · plan · (no number)

Philippine Energy Plan 2023-2050

Philippine Energy Plan 2023-2050

in force unverified non-binding

Summary

The DOE's long-term energy plan, published in three volumes. Its clean energy scenario targets 35% renewables in power generation by 2030 and 50% by 2040, with nuclear and offshore wind as options.

Not yet verified. This entry has not been fully checked against the official text. Confirm the status and links before relying on it.

Reviewer notes: Scouted from desk research (medium confidence). Drafted and consulted on in 2023; a revised edition was reported in 2024-07. The adoption date is not confirmed, the PDF is on the old DOE site (not fetched) and the new DOE site's PEP link is broken. Marked non-binding as a plan that is not a signed instrument; check. The companion Power Development Plan 2023-2050 is not a row yet (date unknown). Climate Action Tracker notes the PEP has no coal phase-out.

History

No amendment or revocation links are recorded for this rule yet.

Related rules in Philippines

Change log

  1. Added to the tracker.

Cite this entry

PEP 2023-2050, “Philippine Energy Plan 2023-2050”. Department of Energy (DOE), Philippines, signed 2023. In: Power Transformation Lab Policy Tracker, status checked 4 Nov 2026. https://power-lab.github.io/policy-tracker/rules/ph-plan-doe-2023-pep/