Compiled from desk research; unverified · binding texts in English
Philippines
The Philippine electricity sector was restructured under the 2001 Electric Power Industry Reform Act (EPIRA): generation and supply are competitive, while transmission (operated by NGCP) and distribution (private utilities and electric cooperatives) remain regulated, and the WESM spot market covers the three main grids. Policy instruments typically come in pairs: a Department of Energy (DOE) circular that sets policy and an Energy Regulatory Commission (ERC) resolution that gives it binding effect and sets prices. The 2008 Renewable Energy Act provides the basis for renewable portfolio standards, green energy auctions, the Green Energy Option and net metering.
- Instruments recorded
- 42
- Still apply
- 38
- Revoked, replaced or expired
- 4
- Verified
- 0 of 42
Rules by topic over time
List all 42 →Each dot is a rule, placed by the date it was signed. A rule with several topics appears in each lane.
in force amended pending draft replaced revoked expired
What applies now, by topic
Tariffs and PPA terms
No longer in force: DC2018-02-0003
Renewable pricing and procurement
No longer in force: DC2020-07-0017
Power wheeling and direct PPAs
No longer in force: DC2018-07-0019
Manufacturing incentives
No longer in force: 2022 SIPP
Foreign investment rules
No longer in force: 2022 SIPP