Grid codes and market rules
Technical grid codes, network access rules and the rules governing wholesale electricity markets.
Indonesia
All 1 →What applies now
- Permen ESDM 1/2015 in force Jan 2015Governs power wheeling: it allows a licence holder to use another licence holder's transmission or distribution network in return for a fee.
Vietnam
All 1 →What applies now
- Electricity Law 2024 in force 30 Nov 2024Replaces the 2004 law. Adds chapters on renewable and new energy, including offshore wind, opens transmission investment to private firms, and gives the legal basis for direct PPAs and self-consumed rooftop solar.
How it got here
Thailand
All 4 →What applies now
- NEPC 2026-07 Direct PPA in force 15 Jul 2026Opens the Direct PPA pilot beyond data centres to industry generally and removes the 2,000 MW cap. EPAC selects and supervises participants, and data centres pay security deposits for grid use.
- NEPC 2025-11 data centres EGAT in force 28 Nov 2025Decides to amend the Royal Decree that defines EGAT's direct customers so that data centres can buy power directly from EGAT. Its exact effect is not yet known.
- NEPC 2025-08 system operator in force 21 Aug 2025Revokes the earlier NEPC decision to separate the system operator from EGAT into its own legal entity. The system operator stays inside EGAT, ring-fenced.
- Energy Industry Act 2007 in force 9 Dec 2007The framework law for the power and gas sectors. It separates policy, regulation and operation, creates the Energy Regulatory Commission (ERC) and the Power Development Fund, and sets the licence regime, with exemptions by Royal Decree (s.47). It obliges network owners to allow access under published codes (s.81), the legal basis for third-party access.
How it got here
Philippines
All 4 →What applies now
- DC2026-01-0001 in force 7 Jan 2026Allows generation companies to finance and build the transmission links their plants need, for power projects critical to the energy transition and supply security. A companion circular, DC2026-02-0007, allows TransCo to finance and build transmission.
- ERC Res. 13/2024 in force 14 Aug 2024Adopts omnibus rules for customer choice programs in the retail electricity market. According to DOE DC2026-01-0002, it consolidates the ERC's issuances on retail competition and open access (RCOA) and the Green Energy Option Program.
- DC2024-03-0009 in force 1 Mar 2024Sets 2024-03-26 as the start of commercial operations of retail competition and open access (RCOA) and the Green Energy Option Program in the Mindanao grid. This extends to Mindanao the retail choice that began elsewhere in 2012 under DC2012-05-0005.
- RA 9136 amended 8 Jun 2001The framework law that restructured the power sector. It unbundled the state utility NPC, created the ERC, the WESM spot market, PSALM and TransCo, and opened generation and supply to competition while transmission and distribution stay regulated franchises. Section 31 provides for retail competition and open access.
How it got here
Malaysia
All 15 →What applies now
- Grid Code 2025 (Peninsular) in force 28 Mar 2025The grid code for Peninsular Malaysia, made by the Energy Commission under s.50A of the Electricity Supply Act 1990 and approved by the Minister. It comes as a Main Code and an Additional Code (glossary and sub-codes) and took effect on 1 January 2026.
- Single Buyer Market Guidelines amended 18 Apr 2018Sets the rules for how the Single Buyer in Peninsular Malaysia plans, schedules, procures and settles electricity. It also sets ring-fencing practices for the Single Buyer (Annex 2).+ amended by Single Buyer Market Guidelines Pin.2024
- NEDA Guidelines amended 17 Apr 2017Sets up the New Enhanced Dispatch Arrangement in Peninsular Malaysia, under which generators without power purchase agreements bid into the Single Buyer's dispatch and are paid the system marginal price. It is also the settlement layer for the CGPP, CRESS and CREAM programmes.
- LSS Connection Guidelines amended 28 Apr 2016Sets the development framework and grid-connection rules for plants in the Large Scale Solar auction rounds, including injection points, milestones to commercial operation and licensing.
- Act 447 amended 22 Aug 1990The framework law for electricity supply in Peninsular Malaysia and Labuan. It requires a licence for every installation, public or private, including own-use generation (s.9), and is the basis for tariffs (s.26), Energy Commission codes (s.50A) and guidelines (s.50C) and licence exemptions (s.54). It has not applied in Sarawak since 1 September 1990, and since 3 January 2024 Sabah regulates electricity under its own enactment.+ amended by Act A1501
How it got here
Coming up
- Act A1775 pending 31 Oct 2025Electricity Supply (Amendment) Act 2025
India
All 2 →What applies now
- ISTS charge waiver order 2021 in force 23 Nov 2021Ministry of Power order waiving inter-state transmission charges for solar and wind projects commissioned by 30 June 2025, with the waiver reduced by 25% a year for projects commissioned after that date. The waiver now operates through the CERC Sharing of Inter-State Transmission Charges and Losses Regulations, 2020, as amended (fourth amendment dated 2025-06-26).
- Electricity Act 2003 amended 26 May 2003The principal law for generation, transmission, distribution, trading and use of electricity. It delicenses generation (including captive generation), provides for open access to transmission and distribution, and sets up the central and state electricity regulatory commissions. Its rule-making powers (section 176) are the basis for the Rights of Consumers and Green Energy Open Access Rules.
Pakistan
All 4 →What applies now
- CTBCM commercial operations in force Mar 2026NEPRA declared 2026-01-22 as the start of commercial operations of the Competitive Trading Bilateral Contract Market, the wholesale market in which eligible buyers and suppliers trade under bilateral contracts, with the Independent System and Market Operator as market operator. A NEPRA determination in October 2025 had cleared the final test run and the Market Commercial Code.
- Wheeling auction mechanism 2026 in force Mar 2026NEPRA approved an auction framework submitted by ISMO that allocates up to 800 MW of demand for wheeling under the CTBCM, with a minimum load of 1 MW per participant and a cap of 20% (160 MW) for any bidder or affiliated group. It builds on Framework Guidelines for Wheeling Auctions issued on 2026-01-22.
- National Electricity Policy 2021 in force 21 Jun 2021Policy issued under section 14A of the NEPRA Act that sets objectives for generation, transmission, distribution and market development and requires a National Electricity Plan to implement it.
- NEPRA (Amendment) Act 2018 in force 2 May 2018Amends the NEPRA Act to restructure the sector toward a competitive market, introducing licences for electric power suppliers, market operator and system operator functions, a National Electricity Policy and Plan (s. 14A), and an appellate tribunal, and ending distribution companies' exclusive right to sell power in their territories.
How it got here
China
All 1 →What applies now
- NDRC/NEA Document 136 (2025) in force 27 Jan 2025Requires all wind and solar output to enter the electricity market, with on-grid prices formed by market trading, and sets up a price settlement ('mechanism price') for a share of output. Projects commissioned before 2025-06-01 keep a mechanism price not above the local coal benchmark; for projects commissioned from 2025-06-01 the mechanism price is set by competitive bidding under a provincial ceiling. Provinces were to issue implementation plans by the end of 2025.
United States
All 3 →What applies now
- FERC Order 1920 long-term transmission planning amended 13 May 2024Revises the pro forma open access transmission tariff to require long-term regional transmission planning, with selection and cost allocation of regional transmission solutions to long-term needs, and to require consideration of alternative transmission technologies and better coordination with interconnection.
- FERC Order 2023 generator interconnection reform amended 27 Jul 2023Revises FERC's pro forma large and small generator interconnection procedures and agreements to address interconnection queue backlogs, replacing serial studies with cluster studies and adding readiness requirements, study deadlines and provisions for new technologies such as storage.
- Infrastructure Investment and Jobs Act in force 15 Nov 2021Omnibus infrastructure law. Division D, title II (sections 40201-40211) funds critical mineral mapping, a rare earth demonstration facility, critical mineral supply chain research and battery programmes; section 40207 provides grants for battery materials processing and for battery manufacturing and recycling ($3,000,000,000 each for FY2022-2026). Other titles fund grid resilience, a transmission facilitation programme and EV charging.
No instruments recorded yet for this topic in: Australia, Bangladesh. This may be a gap in the dataset rather than an absence of instruments.