Malaysia · regulator determination · GP/ST/No.1/2016 (Pin.2024)

Guidelines on Large Scale Solar Photovoltaic Plant for Connection to Electricity Networks, revision of 2 April 2024

Guidelines on Large Scale Solar Photovoltaic Plant for Connection to Electricity Networks (Pin.2024)

in force unverified

Summary

Revision of the Large Scale Solar connection guidelines dated 2 April 2024. The scouting did not record what it changed.

Not yet verified. This entry has not been fully checked against the official text. Confirm the status and links before relying on it.

Reviewer notes: Scouted from desk research (high confidence). Version date 2 April 2024 from the registration record; effective date and content not confirmed. The URL holds the current consolidated text, which ST overwrites on each revision; this version's own text is not archived.

History

All instruments linked to this one by amendment, revocation or partial override, in order of signature. Select an instrument to open its entry.

20162018202020222024LSS Connection Guidelines: amended, signed 28 Apr 2016LSS Connection GuidelinesLSS Connection Guidelines Pin.2019: in force, signed 20 Dec 2018LSS Connection Guidelines Pin.2019LSS Connection Guidelines Pin.2020: in force, signed 20 May 2020LSS Connection Guidelines Pin.2020LSS Connection Guidelines Pin.2024: in force, signed 2 Apr 2024LSS Connection Guidelines Pin.2024

revokes or replaces amends overrides in part in force amended pending draft replaced revoked expired

  1. LSS Connection Guidelines 28 Apr 2016 amended
    Guidelines on Large Scale Solar Photovoltaic Plant for Connection to Electricity Networks
  2. LSS Connection Guidelines Pin.2019 20 Dec 2018 in force
    Guidelines on Large Scale Solar Photovoltaic Plant for Connection to Electricity Networks, revision of 20 December 2018
  3. LSS Connection Guidelines Pin.2020 20 May 2020 in force
    Guidelines on Large Scale Solar Photovoltaic Plant for Connection to Electricity Networks, revision of 20 May 2020
  4. LSS Connection Guidelines Pin.2024 (this rule) 2 Apr 2024 in force
    Guidelines on Large Scale Solar Photovoltaic Plant for Connection to Electricity Networks, revision of 2 April 2024

Related rules in Malaysia

Change log

  1. Added to the tracker.

Cite this entry

LSS Connection Guidelines Pin.2024, “Guidelines on Large Scale Solar Photovoltaic Plant for Connection to Electricity Networks, revision of 2 April 2024”. Energy Commission (Suruhanjaya Tenaga), Malaysia, signed 2 Apr 2024. In: Power Transformation Lab Policy Tracker, status checked 4 Nov 2026. https://power-lab.github.io/policy-tracker/rules/my-gp-2016-1-rev3/