Renewable pricing and procurement
The pricing and procurement of renewable electricity: feed-in tariffs, ceiling prices, auctions and price frames.
Indonesia
All 6 →What applies now
- Perpres 112/2022 in force 13 Sep 2022Sets ceiling prices for renewable electricity purchased by PLN and requires the preparation of a roadmap for the early retirement of coal-fired plants. It prohibits new coal-fired plants except those already in the RUPTL or integrated with industrial projects that meet specified conditions, which permits new captive coal plants at industrial sites.
- Permen ESDM 50/2017 amended Aug 2017Consolidated renewable pricing into one regulation, keeping prices benchmarked to regional and national BPP, and added build-own-operate-transfer terms. It replaced Regulations 12/2017 and 43/2017.+ amended by Permen ESDM 53/2018, Permen ESDM 4/2020
How it got here
No longer in force: Permen ESDM 43/2017, Permen ESDM 12/2017
Vietnam
All 9 →What applies now
- Decree 58/2025 in force 3 Mar 2025Implements the 2024 Electricity Law's renewable chapter, including offshore wind, battery storage requirements and self-consumed rooftop solar, which it moves into this decree from Decree 135/2024.
- MOIT Decision 21/2023 in force 7 Jan 2023Sets ceiling prices for transitional solar and wind projects, below the earlier feed-in tariffs; EVN negotiates each project's price within this frame.
- Circular 15/2022 in force 3 Oct 2022Sets how MOIT calculates the price frame for solar and wind plants after the feed-in tariffs ended, including 'transitional' projects that missed the deadlines.
- Circular 18/2020 in force 17 Jul 2020Implemented Decision 13/2020 and replaced the 2017 solar circular, with a new model PPA and rooftop solar procedures.
- Decision 37/2011 amended 29 Jun 2011Set Vietnam's first feed-in tariff for wind power, at 7.8 US cents/kWh.
How it got here
No longer in force: Decision 13/2020, Decision 39/2018, Circular 16/2017, Decision 11/2017
Thailand
All 11 →What applies now
- ERC community solar Reg. 2026 in force 22 Sep 2026Sets the rules for procuring up to 1,500 MW from community-based solar projects of up to 10 MW each. Projects get a 25-year non-firm PPA with MEA or PEA at THB 2.1679/kWh, and foreign shareholding is capped at 49%.
- EPAC 2026-05 UGT2 rate in force 28 May 2026Sets the rate for UGT2, the green tariff supplied from named renewable plants under the NEPC's 2022 guidelines. The rate itself is not yet confirmed.
- NEPC 2025-10 community solar in force 27 Oct 2025Sets up a 1,500 MW community-based solar programme. Projects of up to 10 MW per site sell to MEA or PEA as very small power producers (VSPP).
- ERC FiT Notif. No. 2 (2025) in force 2025Moves the PPA signing deadline for projects with a 2026 scheduled commercial operation date in the additional FiT round to 29 Jul 2025. It amends a 2024 ERC notification.
- ERC UGT1 rate 2024 in force Feb 2024Approves the UGT1 rate of THB 4.21/kWh, sold on one-year contracts with EGAT, MEA or PEA. The tariff launched in January 2025 with 2 billion kWh offered in the first quarter.
- NEPC 2023-03 additional FiT amended 9 Mar 2023Approves a second procurement round of 3,668.5 MW at the 2022-2030 feed-in tariff rates. The NEPC deferred the round on 25 Dec 2024, after the shortlist, and resumed it with negotiations in May 2025.+ amended by NEPC 2025-05 FiT resumed
- NEPC 2022-11 UGT in force 7 Nov 2022Creates the Utility Green Tariff, a green electricity product sold by the utilities. It sets two products: UGT1, from pooled renewables with no specified source, and UGT2, from named plants.
- ERC FiT Reg. 2022 in force 27 Sep 2022Sets up procurement of up to 5,203 MW of renewable power at the 2022-2030 feed-in tariff: biogas 335 MW, wind 1,500 MW, ground-mounted solar 2,368 MW and solar with storage 1,000 MW. The first round selected 175 projects of about 4,852 MW.
- NEPC 2022-05 FiT rates in force 6 May 2022Sets feed-in tariff rates for 2022-2030 in THB/kWh: biogas 2.0724, ground-mounted solar 2.1679, solar with battery storage 2.8331 and wind 3.1014. Projects in the southern border provinces get THB 0.50/kWh more.
- AEDP2018 in force 19 Mar 2020Sets the renewable energy targets that go with PDP2018 Rev.1. It was put to the NEPC on 19 Mar 2020 together with the Energy Efficiency Plan 2018 and the Gas Plan 2018.
How it got here
Philippines
All 8 →What applies now
- DC2025-10-0024 in force 29 Oct 2025Sets guidelines for virtual power purchase agreements (VPPAs), which are contracts to buy voluntary renewable energy certificates. Power still flows through the WESM or other regulated channels, and VPPAs are recognised as PPAs for financing.
- DC2023-10-0029 amended 12 Dec 2023Sets specific auction policy and guidelines, within the Green Energy Auction Program, for renewable technologies that are not eligible for feed-in tariffs. It was later amended by DC2024-09-0028 and, according to NARO, DC2024-03-0010.
- EO 21/2023 in force 19 Apr 2023Directs the establishment of a policy and administrative framework for offshore wind development. The DOE implemented it through DC2023-06-0020, and the first offshore wind auction (GEA-5) followed.
- DC2021-11-0036 amended 3 Nov 2021Revises the guidelines for the Green Energy Auction Program and repeals the first guidelines of 2020 (DC2020-07-0017). The ERC sets the ceiling (GEAR) prices for each auction round by resolution. It was later amended by DC2023-09-0027 and DC2025-03-0004.
- DC2017-12-0015 amended 22 Dec 2017Requires distribution utilities and suppliers in on-grid areas to source a rising share of their energy from eligible renewables, at first by 1% a year. DC2022-09-0030 raised the annual increment to 2.52% from 2023, and DC2023-05-0015 amended the rules.+ amended by DC2023-05-0015
- RA 9513 in force 16 Dec 2008The framework law for renewable energy. It sets up the Renewable Portfolio Standards, feed-in tariffs, the Green Energy Option (Sec. 9) and net metering (Sec. 10).
How it got here
No longer in force: DC2020-07-0017
Malaysia
All 10 →What applies now
- LSS6 RFP in force 24 Jul 2026Opens the sixth Large Scale Solar bidding round in Peninsular Malaysia for 2,650 MW of solar and 1,250 MW/6,000 MWh of battery storage. It is split into three packages: an open solar-plus-storage package (2,200 MW plus 1,100 MW of storage), a Bumiputera solar-plus-storage package (300 MW plus 150 MW of storage) and a Bumiputera solar-only package (150 MW).
- Sabah Enactment 18/2023 in force 3 Jan 2024Sets up Sabah's own feed-in tariff system under the Energy Commission of Sabah, taking over SEDA's role there: feed-in approvals, renewable energy PPAs, priority purchase, degression and a renewable energy fund. Sabah feed-in approval holders were moved from SEDA to ECoS.
- LSS Connection Guidelines amended 28 Apr 2016Sets the development framework and grid-connection rules for plants in the Large Scale Solar auction rounds, including injection points, milestones to commercial operation and licensing.
- Act 725 amended 2011Sets up the feed-in tariff system for renewable electricity in Peninsular Malaysia and Labuan: SEDA grants feed-in approvals, distribution licensees must buy the power, and tariffs are paid from a renewable energy fund financed by a levy. Sabah moved to its own Renewable Energy Enactment in 2024.+ amended by P.U.(A) 251/2025
How it got here
Coming up
- Act A1689 pending 22 Jul 2023Renewable Energy (Amendment) Act 2023
No longer in force: CGPP
India
All 5 →What applies now
- Renewable Consumption Obligation 2025 in force 27 Sep 2025Revised notification setting renewable consumption obligations for designated consumers, including distribution licensees, open access consumers and captive users, from 2024-25 to 2029-30. Obligations can be met by direct consumption of renewable energy, renewable energy certificates or a buyout payment. It replaces the notification of 20 October 2023.
- Solar TBCB guidelines 2023 amended 27 Jul 2023Guidelines under section 63 of the Electricity Act for procurers buying power from grid-connected solar PV projects through tariff-based competitive bidding. They set the bidding process, contract terms and the allocation of risks between procurers and generators, and replace the 2017 solar bidding guidelines for new tenders.
- Energy Conservation (Amendment) Act 2022 in force 19 Dec 2022Amends the Energy Conservation Act, 2001 to empower the central government to specify a carbon credit trading scheme and issue carbon credit certificates. It allows the government to require designated consumers to meet a minimum share of energy or feedstock from non-fossil sources and extends energy conservation codes to large residential buildings.
- ISTS charge waiver order 2021 in force 23 Nov 2021Ministry of Power order waiving inter-state transmission charges for solar and wind projects commissioned by 30 June 2025, with the waiver reduced by 25% a year for projects commissioned after that date. The waiver now operates through the CERC Sharing of Inter-State Transmission Charges and Losses Regulations, 2020, as amended (fourth amendment dated 2025-06-26).
How it got here
No longer in force: Renewable Consumption Obligation 2023
Australia
All 2 →What applies now
- Capacity Investment Scheme Program Instrument 2023 amended 7 Nov 2023Provides the legislative authority for spending under the Capacity Investment Scheme, which underwrites new renewable generation and clean dispatchable capacity (including storage) selected through competitive tenders run with the market operator.
- Renewable Energy (Electricity) Amendment Act 2015 in force 26 Jun 2015Amends the Renewable Energy (Electricity) Act 2000 to reduce the Large-scale Renewable Energy Target to 33,000 GWh in 2020 and make related changes to the renewable energy certificate scheme.
Pakistan
All 2 →What applies now
- ARE Policy 2019 in force —Sets targets for alternative and renewable energy of 20% of generation capacity by 2025 and 30% by 2030 and moves procurement of new projects to competitive bidding in place of cost-plus or upfront tariffs. It also provides incentives for local manufacturing of solar panels and wind turbines, including customs duty exemptions on equipment and materials.
How it got here
No longer in force: RE Policy 2006
Bangladesh
All 6 →What applies now
- Quick Enhancement Act Repeal Act 2026 in force 10 Apr 2026Repeals Act No. 54 of 2010 with savings by Act of Parliament and repeals Ordinance No. 15 of 2024.
- Renewable Energy Policy 2025 in force 6 May 2025Sets targets for renewable energy of 20% of electricity by 2030 and 30% by 2040 and replaces the 2008 policy. Secondary sources report capacity targets of 6,145 MW by 2030 and 17,470 MW by 2041.
- SREDA Act 2012 in force 10 Dec 2012Establishes the Sustainable and Renewable Energy Development Authority (SREDA) to promote renewable energy and energy efficiency and conservation.
How it got here
No longer in force: Quick Enhancement Act Repeal Ordinance 2024, Quick Enhancement of Electricity and Energy Supply (Special Provisions) Act 2010, Renewable Energy Policy 2008
China
All 4 →What applies now
- NDRC/NEA Document 136 (2025) in force 27 Jan 2025Requires all wind and solar output to enter the electricity market, with on-grid prices formed by market trading, and sets up a price settlement ('mechanism price') for a share of output. Projects commissioned before 2025-06-01 keep a mechanism price not above the local coal benchmark; for projects commissioned from 2025-06-01 the mechanism price is set by competitive bidding under a provincial ceiling. Provinces were to issue implementation plans by the end of 2025.
- Green certificate full coverage 2023 in force —Extends green electricity certificates from onshore wind and utility-scale solar to all registered renewable generation projects and makes the certificate the basis for proving renewable electricity consumption. It sets rules on issuance, trading and use of certificates.
- Renewable Energy Law amendment 2009 in force 26 Dec 2009Amends the Renewable Energy Law of 2005, requiring a national renewable energy development plan with total and medium- to long-term targets. It places the grid companies' obligation to purchase renewable electricity within that plan and provides for a renewable energy development fund.
Coming up
- Renewable Energy Law revision draft 2026 draft 2 Nov 2026Renewable Energy Law of the PRC (Revision Draft)
United States
All 6 →What applies now
- Beginning of construction for wind and solar (OBBBA) in force 15 Aug 2025Guidance, issued under Executive Order 14315, on when construction of a wind or solar facility begins for the OBBBA termination of the 45Y and 48E credits. It requires the physical work test and removes the five percent cost safe harbour except for solar facilities of 1.5 MW or less, and keeps a four-year continuity safe harbour.
- Ending subsidies for foreign-controlled energy sources in force 7 Jul 2025Directs the Treasury, within 45 days of enactment of the One Big Beautiful Bill Act, to strictly enforce the termination of the 45Y and 48E credits for wind and solar, including beginning-of-construction guidance, and to implement the foreign entity of concern restrictions. Directs the Interior to remove preferences for wind and solar.
- 45Y/48E clean electricity credits final rule in force 15 Jan 2025Final regulations for the technology-neutral clean electricity production and investment credits for facilities and energy storage placed in service after 2024. They set rules for determining greenhouse gas emissions rates, petitioning for provisional rates and eligibility in specific cases.
- Inflation Reduction Act of 2022 amended 16 Aug 2022Budget reconciliation law that created or extended clean energy tax credits, including the clean vehicle credit with critical mineral and battery component sourcing rules (section 13401, Code 30D), the advanced manufacturing production credit for solar, wind, inverter, battery components and critical minerals (section 13502, Code 45X) and technology-neutral clean electricity production and investment credits (sections 13701-13702, Code 45Y and 48E) with domestic content bonus amounts. It also allowed transfer and elective payment of credits.+ amended by One Big Beautiful Bill Act
- California SB 100 (100 Percent Clean Energy Act of 2018) amended 10 Sep 2018Raises California's renewables portfolio standard to 60 percent of retail sales by 2030 and sets a state policy that eligible renewable and zero-carbon resources supply 100 percent of retail sales and state agency electricity by 2045.
How it got here
revokes or replaces amends overrides in part in force amended pending draft replaced revoked expired