Thailand · decision · 2/2566 (165)
NEPC resolution on additional renewable procurement (no-fuel-cost group and industrial waste) under FiT 2022-2030
NEPC resolution on additional renewable procurement (no-fuel-cost group and industrial waste) under FiT 2022-2030
Summary
Approves a second procurement round of 3,668.5 MW at the 2022-2030 feed-in tariff rates. The NEPC deferred the round on 25 Dec 2024, after the shortlist, and resumed it with negotiations in May 2025.
Reviewer notes: Scouted from desk research (high confidence). Thai title to be added. Thai press split: about 2,632 MW solar, 1,000 MW wind, 6.5 MW biogas, 130 MW industrial waste. Shortlist 16 Dec 2024; deferral by NEPC 4/2567 (170) on 25 Dec 2024 (no row; fact-finding committee set up). The ERC regulation for this round (B.E. 2567) has no row yet: title and date not confirmed. date_in_force taken as the meeting date.
History
All instruments linked to this one by amendment, revocation or partial override, in order of signature. Select an instrument to open its entry.
revokes or replaces amends overrides in part in force amended pending draft replaced revoked expired
-
NEPC 2023-03 additional FiT (this rule) 9 Mar 2023 amendedNEPC resolution on additional renewable procurement (no-fuel-cost group and industrial waste) under FiT 2022-2030
-
NEPC resolution on the remaining additional renewable procurement under the 2023-2030 clean power planAmends NEPC 2023-03 additional FiT.
Related rules in Thailand
Change log
-
Added to the tracker.
Cite this entry
NEPC 2023-03 additional FiT, “NEPC resolution on additional renewable procurement (no-fuel-cost group and industrial waste) under FiT 2022-2030”. National Energy Policy Council (NEPC), Thailand, signed 9 Mar 2023. In: Power Transformation Lab Policy Tracker, status checked 4 Nov 2026. https://power-lab.github.io/policy-tracker/rules/th-nepc-2023-2-fit-additional/