Thailand · regulator determination · (No. 2) B.E. 2568
ERC Notification (No. 2) B.E. 2568 revising the PPA timeline for the 2024 additional FiT round (no-fuel-cost group)
ERC Notification (No. 2) B.E. 2568 revising the PPA timeline for the 2024 additional FiT round (no-fuel-cost group)
Summary
Moves the PPA signing deadline for projects with a 2026 scheduled commercial operation date in the additional FiT round to 29 Jul 2025. It amends a 2024 ERC notification.
Reviewer notes: Scouted from desk research (medium confidence). Thai title to be added. Exact date not confirmed (before 29 Jul 2025). The 2024 ERC notification it amends has no row yet. Likely carries out NEPC 1/2568 (TH-NEPC-2025-1-FIT-ADDITIONAL) or the round set by NEPC 2/2566, but the report does not say; add an implements link once checked.
History
No amendment or revocation links are recorded for this rule yet.
Related rules in Thailand
Change log
-
Added to the tracker.
Cite this entry
ERC FiT Notif. No. 2 (2025), “ERC Notification (No. 2) B.E. 2568 revising the PPA timeline for the 2024 additional FiT round (no-fuel-cost group)”. Energy Regulatory Commission (ERC), Thailand, signed 2025. In: Power Transformation Lab Policy Tracker, status checked 4 Nov 2026. https://power-lab.github.io/policy-tracker/rules/th-erc-2025-fit-notification-2/