Thailand · regulator determination · B.E. 2569

ERC Regulation on procurement of electricity from community-based solar power generation projects B.E. 2569 (2026)

ERC Regulation on procurement of electricity from community-based solar power generation projects B.E. 2569 (2026)

in force unverified

Summary

Sets the rules for procuring up to 1,500 MW from community-based solar projects of up to 10 MW each. Projects get a 25-year non-firm PPA with MEA or PEA at THB 2.1679/kWh, and foreign shareholding is capped at 49%.

Not yet verified. This entry has not been fully checked against the official text. Confirm the status and links before relying on it.

Reviewer notes: Scouted from desk research (medium confidence). Thai title to be added. 22 Sep 2026 is the Gazette date (signing date not confirmed); in force 23 Sep 2026 per law-firm summaries; Mori Hamada PDF blocked (403), details from search summaries. English title is our rendering.

History

No amendment or revocation links are recorded for this rule yet.

Implementation

This rule implements NEPC 2025-10 community solar.

Related rules in Thailand

Change log

  1. Added to the tracker.

Cite this entry

ERC community solar Reg. 2026, “ERC Regulation on procurement of electricity from community-based solar power generation projects B.E. 2569 (2026)”. Energy Regulatory Commission (ERC), Thailand, signed 22 Sep 2026. In: Power Transformation Lab Policy Tracker, status checked 4 Nov 2026. https://power-lab.github.io/policy-tracker/rules/th-erc-2026-community-solar/