Malaysia · government regulation · P.U.(A) 251/2025

Renewable Energy (Amendment of Schedule) Order 2025

Renewable Energy (Amendment of Schedule) Order 2025

in force unverified

Summary

A ministerial order under s.63 of the Renewable Energy Act 2011 that amends the Act's schedule. It extends the feed-in tariff period for biogas from 16 to 21 years, with effect from 28 January 2019.

Not yet verified. This entry has not been fully checked against the official text. Confirm the status and links before relying on it.

Reviewer notes: Scouted from desk research (high confidence). Made 1 Aug 2025 and deemed in operation from 28 Jan 2019, so date_in_force is earlier than date_signed. Covers biogas items (b)(i)-(iii). Earlier schedule orders (not rows): P.U.(A) 131/2022 (biogas cap from 5 MW to 30 MW), P.U.(A) 347/2020, P.U.(A) 222/2017.

History

All instruments linked to this one by amendment, revocation or partial override, in order of signature. Select an instrument to open its entry.

20112013201520172019202120232025Act 725: amended, signed 2011Act 725Act A1689: pending, signed 22 Jul 2023Act A1689Sabah Enactment 18/2023: in force, signed 3 Jan 2024Sabah Enactment 18/2023P.U.(A) 251/2025: in force, signed 1 Aug 2025P.U.(A) 251/2025

revokes or replaces amends overrides in part in force amended pending draft replaced revoked expired

  1. Act 725 2011 amended
    Renewable Energy Act 2011
  2. Act A1689 22 Jul 2023 pending
    Renewable Energy (Amendment) Act 2023
    Amends Act 725.
  3. Sabah Enactment 18/2023 3 Jan 2024 in force
    Sabah Renewable Energy Enactment 2024
    Overrides in part Act 725.
  4. P.U.(A) 251/2025 (this rule) 1 Aug 2025 in force
    Renewable Energy (Amendment of Schedule) Order 2025
    Amends Act 725.

Related rules in Malaysia

Change log

  1. Added to the tracker.

Cite this entry

P.U.(A) 251/2025, “Renewable Energy (Amendment of Schedule) Order 2025”. Minister of Energy Transition and Water Transformation (PETRA), Malaysia, signed 1 Aug 2025. In: Power Transformation Lab Policy Tracker, status checked 4 Nov 2026. https://power-lab.github.io/policy-tracker/rules/my-pua-2025-251/