Malaysia · regulator determination · GP/ST/No.1/2016 (Pin.2020)
Guidelines on Large Scale Solar Photovoltaic Plant for Connection to Electricity Networks, revision of 20 May 2020
Guidelines on Large Scale Solar Photovoltaic Plant for Connection to Electricity Networks (Pin.2020)
Summary
Revision of the Large Scale Solar connection guidelines dated 20 May 2020. The scouting did not record what it changed.
Reviewer notes: Scouted from desk research (high confidence). Version date 20 May 2020 from the registration record; effective date and content not confirmed. The URL holds the current consolidated text, which ST overwrites on each revision; this version's own text is not archived.
History
All instruments linked to this one by amendment, revocation or partial override, in order of signature. Select an instrument to open its entry.
revokes or replaces amends overrides in part in force amended pending draft replaced revoked expired
-
Guidelines on Large Scale Solar Photovoltaic Plant for Connection to Electricity Networks
-
Guidelines on Large Scale Solar Photovoltaic Plant for Connection to Electricity Networks, revision of 20 December 2018Amends LSS Connection Guidelines.
-
LSS Connection Guidelines Pin.2020 (this rule) 20 May 2020 in forceGuidelines on Large Scale Solar Photovoltaic Plant for Connection to Electricity Networks, revision of 20 May 2020Amends LSS Connection Guidelines.
-
Guidelines on Large Scale Solar Photovoltaic Plant for Connection to Electricity Networks, revision of 2 April 2024Amends LSS Connection Guidelines.
Related rules in Malaysia
Change log
-
Added to the tracker.
Cite this entry
LSS Connection Guidelines Pin.2020, “Guidelines on Large Scale Solar Photovoltaic Plant for Connection to Electricity Networks, revision of 20 May 2020”. Energy Commission (Suruhanjaya Tenaga), Malaysia, signed 20 May 2020. In: Power Transformation Lab Policy Tracker, status checked 4 Nov 2026. https://power-lab.github.io/policy-tracker/rules/my-gp-2016-1-rev2/