Grid Code for Peninsular Malaysia - Main Code
Grid Code for Peninsular Malaysia - Main Code
Summary
The grid code for Peninsular Malaysia, made by the Energy Commission under s.50A of the Electricity Supply Act 1990 and approved by the Minister. It comes as a Main Code and an Additional Code (glossary and sub-codes) and took effect on 1 January 2026.
Reviewer notes: Scouted from desk research (high confidence). Dated 28 Mar 2025; in force 1 Jan 2026. Appears to replace the Grid Code for Peninsular Malaysia KOD/ST/No.2/2010 (not a row), which the CRESS guidelines still cite, but no revocation clause was found in the first 30 pages.
History
No amendment or revocation links are recorded for this rule yet.
Implementation
This rule implements Act 447.
Related rules in Malaysia
Change log
-
Added to the tracker.
Cite this entry
Grid Code 2025 (Peninsular), “Grid Code for Peninsular Malaysia - Main Code”. Energy Commission (Suruhanjaya Tenaga), approved by the Minister of Energy Transition and Water Transformation, Malaysia, signed 28 Mar 2025. In: Power Transformation Lab Policy Tracker, status checked 4 Nov 2026. https://power-lab.github.io/policy-tracker/rules/my-kod-2025-8/