Compiled from desk research; unverified · binding texts in English and Malay

Malaysia

In Peninsular Malaysia, electricity is supplied by the vertically integrated utility TNB, which contains a ring-fenced Single Buyer and Grid System Operator, under the Electricity Supply Act 1990; Sabah and Sarawak have separate systems governed by state law. Most operational rules are binding Energy Commission guidelines, which are revised in place, often several times a year, while charges, quotas and procurement rounds are frequently first announced by the energy ministry (PETRA). The National Energy Transition Roadmap (2023) sets long-term targets, including 70% renewable installed capacity by 2050 and no new coal-fired plants.

Instruments recorded
65
Still apply
61
Revoked, replaced or expired
1
Verified
0 of 65

Rules by topic over time

List all 65 →

Each dot is a rule, placed by the date it was signed. A rule with several topics appears in each lane.

19901995200020052010201520202025Electricity framework lawAct 447: Electricity Supply Act 1990 (amended, 22 Aug 1990)Act A1501: Electricity Supply (Amendment) Act 2015 (in force, 30 Oct 2015)Cap. A210/2023: Electricity (Amendment) Ordinance 2023 (Sarawak) (in force, 21 Nov 2023)Sabah Enactment 17/2023: Electricity Supply Enactment 2024 (Sabah) (in force, 3 Jan 2024)Sabah Enactment 18/2023: Sabah Renewable Energy Enactment 2024 (in force, 3 Jan 2024)Act A1739: Electricity Supply (Amendment) Act 2024 (in force, 2 Jul 2024)Act A1775: Electricity Supply (Amendment) Act 2025 (pending, 31 Oct 2025)Act A1776: Energy Commission (Amendment) Act 2025 (pending, 18 Nov 2025)National power plansNETR 2023: National Energy Transition Roadmap (NETR) (in force, 29 Aug 2023)Grid codes and market rulesAct 447: Electricity Supply Act 1990 (amended, 22 Aug 1990)Act A1501: Electricity Supply (Amendment) Act 2015 (in force, 30 Oct 2015)LSS Connection Guidelines: Guidelines on Large Scale Solar Photovoltaic Plant for Connection to Electricity Networks (amended, 28 Apr 2016)NEDA Guidelines: Guidelines for New Enhanced Dispatch Arrangement (NEDA) (amended, 17 Apr 2017)Single Buyer Market Guidelines: Guidelines for Single Buyer Market (Peninsular Malaysia) 2018 (amended, 18 Apr 2018)LSS Connection Guidelines Pin.2019: Guidelines on Large Scale Solar Photovoltaic Plant for Connection to Electricity Networks, revision of 20 December 2018 (in force, 20 Dec 2018)NEDA Guidelines Pin.2019: Guidelines for New Enhanced Dispatch Arrangement (NEDA), 2019 revision (in force, 28 May 2019)NEDA Guidelines Pin.2/2019: Guidelines for New Enhanced Dispatch Arrangement (NEDA), second 2019 revision (in force, 5 Dec 2019)LSS Connection Guidelines Pin.2020: Guidelines on Large Scale Solar Photovoltaic Plant for Connection to Electricity Networks, revision of 20 May 2020 (in force, 20 May 2020)LSS Connection Guidelines Pin.2024: Guidelines on Large Scale Solar Photovoltaic Plant for Connection to Electricity Networks, revision of 2 April 2024 (in force, 2 Apr 2024)Single Buyer Market Guidelines Pin.2024: Guidelines for Single Buyer Market (Peninsular Malaysia) 2018, 2024 revision (in force, 18 Nov 2024)NEDA Guidelines Pin.2024: Guidelines for New Enhanced Dispatch Arrangement (NEDA), 2024 revision (in force, 22 Nov 2024)Grid Code 2025 (Peninsular): Grid Code for Peninsular Malaysia - Main Code (in force, 28 Mar 2025)Act A1775: Electricity Supply (Amendment) Act 2025 (pending, 31 Oct 2025)NEDA Guidelines Pindaan 2025: Guidelines for New Enhanced Dispatch Arrangement (NEDA), 2025 revision (in force, 26 Dec 2025)Tariffs and PPA termsGET Guidelines: Guidelines on Green Electricity Tariff (GET) (amended, 2023)GET Guidelines rev. 2024-11: Guidelines on Green Electricity Tariff (GET), revision of 25 November 2024 (in force, 25 Nov 2024)GET Guidelines rev. 2025-01: Guidelines on Green Electricity Tariff (GET), revision of 31 January 2025 (in force, 31 Jan 2025)RP4 tariff 2025-2027: Electricity tariff schedule for Regulatory Period 4 (Peninsular Malaysia), 1 Jul 2025 - 31 Dec 2027 (in force, 20 Jun 2025)GET Guidelines Pindaan 2/2025: Guidelines on Green Electricity Tariff (GET), revision of 14 July 2025 (in force, 14 Jul 2025)IBR Guidelines 2025 (Peninsular): Guidelines on Electricity Tariff Determination under Incentive-Based Regulation (IBR) for Peninsular Malaysia 2025 (in force, 2025)Renewable pricing and procurementAct 725: Renewable Energy Act 2011 (amended, 2011)LSS Connection Guidelines: Guidelines on Large Scale Solar Photovoltaic Plant for Connection to Electricity Networks (amended, 28 Apr 2016)LSS Connection Guidelines Pin.2019: Guidelines on Large Scale Solar Photovoltaic Plant for Connection to Electricity Networks, revision of 20 December 2018 (in force, 20 Dec 2018)LSS Connection Guidelines Pin.2020: Guidelines on Large Scale Solar Photovoltaic Plant for Connection to Electricity Networks, revision of 20 May 2020 (in force, 20 May 2020)CGPP: Corporate Green Power Programme (virtual PPA for solar) (expired, 7 Nov 2022)Act A1689: Renewable Energy (Amendment) Act 2023 (pending, 22 Jul 2023)Sabah Enactment 18/2023: Sabah Renewable Energy Enactment 2024 (in force, 3 Jan 2024)LSS Connection Guidelines Pin.2024: Guidelines on Large Scale Solar Photovoltaic Plant for Connection to Electricity Networks, revision of 2 April 2024 (in force, 2 Apr 2024)P.U.(A) 251/2025: Renewable Energy (Amendment of Schedule) Order 2025 (in force, 1 Aug 2025)LSS6 RFP: Notice of issue of the Request for Proposal for the sixth Large Scale Solar competitive bidding round (LSS6) (in force, 24 Jul 2026)Rooftop and distributed solarNEM Rakyat & GoMEn Guidelines: Guidelines for Solar Photovoltaic Installation under the Programme of NEM Rakyat and NEM GoMEn in Peninsular Malaysia (amended, 29 Jan 2021)NOVA Guidelines: Guidelines for Solar Photovoltaic Installation under Net Offset Virtual Aggregation (NOVA) Programme in Peninsular Malaysia (amended, 29 Jan 2021)NEM Rakyat & GoMEn Guidelines rev. 2023-07: Guidelines for Solar Photovoltaic Installation under the Programme of NEM Rakyat and NEM GoMEn in Peninsular Malaysia, revision of 15 July 2023 (in force, 15 Jul 2023)NOVA Guidelines rev. 2023-07: Guidelines for Solar Photovoltaic Installation under Net Offset Virtual Aggregation (NOVA) Programme in Peninsular Malaysia, revision of 15 July 2023 (in force, 15 Jul 2023)Cap. A210/2023: Electricity (Amendment) Ordinance 2023 (Sarawak) (in force, 21 Nov 2023)NEM Rakyat & GoMEn Guidelines rev. 2024-02: Guidelines for Solar Photovoltaic Installation under the Programme of NEM Rakyat and NEM GoMEn in Peninsular Malaysia, revision of 5 February 2024 (in force, 5 Feb 2024)NOVA Guidelines rev. 2024-02: Guidelines for Solar Photovoltaic Installation under Net Offset Virtual Aggregation (NOVA) Programme in Peninsular Malaysia, revision of 5 February 2024 (in force, 5 Feb 2024)NEM Rakyat & GoMEn Guidelines rev. 2024-04: Guidelines for Solar Photovoltaic Installation under the Programme of NEM Rakyat and NEM GoMEn in Peninsular Malaysia, revision of 1 April 2024 (in force, 1 Apr 2024)SELCO Guidelines: Guidelines for Solar Photovoltaic Installation for Self-Consumption (SELCO) in Peninsular Malaysia (amended, 2024)NEM Rakyat & GoMEn Guidelines rev. 2024-09: Guidelines for Solar Photovoltaic Installation under the Programme of NEM Rakyat and NEM GoMEn in Peninsular Malaysia, revision of 20 September 2024 (in force, 20 Sep 2024)NEM Rakyat & GoMEn Guidelines rev. 2024-11: Guidelines for Solar Photovoltaic Installation under the Programme of NEM Rakyat and NEM GoMEn in Peninsular Malaysia, revision of 25 November 2024 (in force, 25 Nov 2024)NOVA Guidelines rev. 2024-11: Guidelines for Solar Photovoltaic Installation under Net Offset Virtual Aggregation (NOVA) Programme in Peninsular Malaysia, revision of 25 November 2024 (in force, 25 Nov 2024)NEM Rakyat & GoMEn Guidelines rev. 2025-03: Guidelines for Solar Photovoltaic Installation under the Programme of NEM Rakyat and NEM GoMEn in Peninsular Malaysia, revision of 1 March 2025 (in force, 1 Mar 2025)NOVA Guidelines rev. 2025-03: Guidelines for Solar Photovoltaic Installation under Net Offset Virtual Aggregation (NOVA) Programme in Peninsular Malaysia, revision of 1 March 2025 (in force, 1 Mar 2025)SELCO Guidelines Pin.2025: Guidelines for Solar Photovoltaic Installation for Self-Consumption in Peninsular Malaysia, 2025 revision (in force, 27 Mar 2025)CREAM Guidelines: Guidelines for Community Renewable Energy Aggregation Mechanism (CREAM) (in force, 2025)Solar ATAP Guidelines: Guidelines for Solar Accelerated Transition Action Programme (Solar ATAP) in Peninsular Malaysia (in force, 30 Dec 2025)SELCO Guidelines Pin.1/2026: Guidelines for Solar Photovoltaic Installation for Self-Consumption in Peninsular Malaysia, 2026 revision (in force, 21 Jul 2026)NOVA Guidelines Pin.1/2026: Guidelines for Solar Photovoltaic Installation under Net Offset Virtual Aggregation (NOVA) Programme in Peninsular Malaysia, 2026 revision (in force, 23 Jul 2026)NEM Rakyat & GoMEn Guidelines Pin.1/2026: Guidelines for Solar Photovoltaic Installation under the Programme of NEM Rakyat and NEM GoMEn in Peninsular Malaysia, 2026 revision (in force, 19 Aug 2026)Power wheeling and direct PPAsNEDA Guidelines: Guidelines for New Enhanced Dispatch Arrangement (NEDA) (amended, 17 Apr 2017)NEDA Guidelines Pin.2019: Guidelines for New Enhanced Dispatch Arrangement (NEDA), 2019 revision (in force, 28 May 2019)NEDA Guidelines Pin.2/2019: Guidelines for New Enhanced Dispatch Arrangement (NEDA), second 2019 revision (in force, 5 Dec 2019)CGPP: Corporate Green Power Programme (virtual PPA for solar) (expired, 7 Nov 2022)Cap. A210/2023: Electricity (Amendment) Ordinance 2023 (Sarawak) (in force, 21 Nov 2023)CRESS Guidelines: Guidelines for Corporate Renewable Energy Supply Scheme (CRESS) (amended, 20 Sep 2024)NEDA Guidelines Pin.2024: Guidelines for New Enhanced Dispatch Arrangement (NEDA), 2024 revision (in force, 22 Nov 2024)CRESS Guidelines Mar 2025: Guidelines for Corporate Renewable Energy Supply Scheme (CRESS), second version (March 2025) (in force, 1 Mar 2025)CREAM Guidelines: Guidelines for Community Renewable Energy Aggregation Mechanism (CREAM) (in force, 2025)NEDA Guidelines Pindaan 2025: Guidelines for New Enhanced Dispatch Arrangement (NEDA), 2025 revision (in force, 26 Dec 2025)CRESS Guidelines Pindaan 2025: Guidelines for Corporate Renewable Energy Supply Scheme (CRESS), third version (December 2025) (in force, 26 Dec 2025)CRESS Acceleration Package: CRESS Acceleration Package (fixed system access charge for early projects) (in force, 18 Sep 2026)Captive power and licensingAct 447: Electricity Supply Act 1990 (amended, 22 Aug 1990)Sabah Enactment 17/2023: Electricity Supply Enactment 2024 (Sabah) (in force, 3 Jan 2024)SELCO Guidelines: Guidelines for Solar Photovoltaic Installation for Self-Consumption (SELCO) in Peninsular Malaysia (amended, 2024)Licence Application Guidelines 2024: Guidelines on Licence Application under the Electricity Supply Act 1990 (2nd edition) (in force, 2024)SELCO Guidelines Pin.2025: Guidelines for Solar Photovoltaic Installation for Self-Consumption in Peninsular Malaysia, 2025 revision (in force, 27 Mar 2025)SELCO Guidelines Pin.1/2026: Guidelines for Solar Photovoltaic Installation for Self-Consumption in Peninsular Malaysia, 2026 revision (in force, 21 Jul 2026)Coal phase-out and early retirementNETR 2023: National Energy Transition Roadmap (NETR) (in force, 29 Aug 2023)Energy storageSELCO Guidelines: Guidelines for Solar Photovoltaic Installation for Self-Consumption (SELCO) in Peninsular Malaysia (amended, 2024)SELCO Guidelines Pin.2025: Guidelines for Solar Photovoltaic Installation for Self-Consumption in Peninsular Malaysia, 2025 revision (in force, 27 Mar 2025)SELCO Guidelines Pin.1/2026: Guidelines for Solar Photovoltaic Installation for Self-Consumption in Peninsular Malaysia, 2026 revision (in force, 21 Jul 2026)LSS6 RFP: Notice of issue of the Request for Proposal for the sixth Large Scale Solar competitive bidding round (LSS6) (in force, 24 Jul 2026)Cross-border electricity tradeAct A1775: Electricity Supply (Amendment) Act 2025 (pending, 31 Oct 2025)Act A1776: Energy Commission (Amendment) Act 2025 (pending, 18 Nov 2025)National energy strategyNEP 2022-2040: National Energy Policy 2022-2040 (Dasar Tenaga Negara) (in force, 19 Sep 2022)NETR 2023: National Energy Transition Roadmap (NETR) (in force, 29 Aug 2023)Energy efficiencyAct A1739: Electricity Supply (Amendment) Act 2024 (in force, 2 Jul 2024)RP4 tariff 2025-2027: Electricity tariff schedule for Regulatory Period 4 (Peninsular Malaysia), 1 Jul 2025 - 31 Dec 2027 (in force, 20 Jun 2025)Electric vehicle adoptionNAP 2020: National Automotive Policy 2020 (in force, 21 Feb 2020)Low Carbon Mobility Blueprint: Low Carbon Mobility Blueprint 2021-2030 (in force, 2021)EV duty and tax exemptions: Budget 2022 exemptions of import duty, excise duty, sales tax and road tax for electric vehicles (amended, 29 Oct 2021)CBU EV import conditions: MITI revised import policy for completely built-up electric vehicles (in force, 6 May 2026)Critical minerals and downstreamingMineral Industry Transformation Plan 2021-2030: National Mineral Industry Transformation Plan Framework 2021-2030 (in force, 22 Apr 2021)Raw rare earth export ban: Policy prohibiting the export of raw rare earth elements (in force, 11 Sep 2023)Manufacturing incentivesNAP 2020: National Automotive Policy 2020 (in force, 21 Feb 2020)EV duty and tax exemptions: Budget 2022 exemptions of import duty, excise duty, sales tax and road tax for electric vehicles (amended, 29 Oct 2021)NIMP 2030: New Industrial Master Plan 2030 (in force, 1 Sep 2023)GITA/GITE 2024-2026: Budget 2024 revision of the Green Investment Tax Allowance and Green Income Tax Exemption (in force, 13 Oct 2023)Foreign investment rulesNIMP 2030: New Industrial Master Plan 2030 (in force, 1 Sep 2023)Import tariffsEV duty and tax exemptions: Budget 2022 exemptions of import duty, excise duty, sales tax and road tax for electric vehicles (amended, 29 Oct 2021)Import approvals and standardsCBU EV import conditions: MITI revised import policy for completely built-up electric vehicles (in force, 6 May 2026)Export restrictionsRaw rare earth export ban: Policy prohibiting the export of raw rare earth elements (in force, 11 Sep 2023)

in force amended pending draft replaced revoked expired

What applies now, by topic

Electricity framework law

Coming up: Act A1776 pending, Act A1775 pending

National power plans

Grid codes and market rules

Coming up: Act A1775 pending

Tariffs and PPA terms

Renewable pricing and procurement

Coming up: Act A1689 pending

No longer in force: CGPP

Rooftop and distributed solar

Power wheeling and direct PPAs

No longer in force: CGPP

Captive power and licensing

Coal phase-out and early retirement

Energy storage

Cross-border electricity trade

No rule in force recorded.

Coming up: Act A1776 pending, Act A1775 pending

National energy strategy

Energy efficiency

Electric vehicle adoption

Critical minerals and downstreaming

Manufacturing incentives

Foreign investment rules

Import tariffs

Import approvals and standards

Export restrictions