Malaysia · regulator determination · GP/ST/No.60/2025

Guidelines for Solar Accelerated Transition Action Programme (Solar ATAP) in Peninsular Malaysia

Guidelines for Solar Accelerated Transition Action Programme in Peninsular Malaysia

in force unverified

Summary

Replaces net energy metering for new rooftop solar applicants in Peninsular Malaysia from 1 January 2026. Exports are credited on energy only, at the energy charge for homes and at the average system marginal price for businesses, with caps of 5 kW (single phase) and 15 kW (three phase) for homes and 1,000 kW otherwise. NEM participants can join only by ending their NEM contract.

Not yet verified. This entry has not been fully checked against the official text. Confirm the status and links before relying on it.

Reviewer notes: Scouted from desk research (high confidence). Registered guideline under s.50C of Act 447; registered 30 Dec 2025. PETRA sets the policy and SEDA is the implementing agency (eATAP system; https://www.seda.gov.my/reportal/atap/). Successor to NEM 3.0 but does not revoke the NEM guidelines, so there is no revokes link. ST lists two copies of the PDF (with and without _0).

History

No amendment or revocation links are recorded for this rule yet.

Implementation

This rule implements Act 447.

Related rules in Malaysia

Change log

  1. Added to the tracker.

Cite this entry

Solar ATAP Guidelines, “Guidelines for Solar Accelerated Transition Action Programme (Solar ATAP) in Peninsular Malaysia”. Energy Commission (Suruhanjaya Tenaga), Malaysia, signed 30 Dec 2025. In: Power Transformation Lab Policy Tracker, status checked 4 Nov 2026. https://power-lab.github.io/policy-tracker/rules/my-gp-2025-60/