Malaysia · regulator determination · GP/ST/No.27/2021 (Pin.1/2026)
Guidelines for Solar Photovoltaic Installation under the Programme of NEM Rakyat and NEM GoMEn in Peninsular Malaysia, 2026 revision
Guidelines for Solar Photovoltaic Installation under the Programme of NEM Rakyat and NEM GoMEn in Peninsular Malaysia (Pin.1/2026)
Summary
Revision of the NEM Rakyat and NEM GoMEn guidelines that adapts them to the new tariff structure.
Reviewer notes: Scouted from desk research (high confidence). Version date 19 Aug 2026 from the registration record; effective date not confirmed. The URL holds the current consolidated text, which ST overwrites on each revision; this version's own text is not archived.
History
All instruments linked to this one by amendment, revocation or partial override, in order of signature. Select an instrument to open its entry.
revokes or replaces amends overrides in part in force amended pending draft replaced revoked expired
-
Guidelines for Solar Photovoltaic Installation under the Programme of NEM Rakyat and NEM GoMEn in Peninsular Malaysia
-
Guidelines for Solar Photovoltaic Installation under the Programme of NEM Rakyat and NEM GoMEn in Peninsular Malaysia, revision of 15 July 2023Amends NEM Rakyat & GoMEn Guidelines.
-
Guidelines for Solar Photovoltaic Installation under the Programme of NEM Rakyat and NEM GoMEn in Peninsular Malaysia, revision of 5 February 2024Amends NEM Rakyat & GoMEn Guidelines.
-
Guidelines for Solar Photovoltaic Installation under the Programme of NEM Rakyat and NEM GoMEn in Peninsular Malaysia, revision of 1 April 2024Amends NEM Rakyat & GoMEn Guidelines.
-
Guidelines for Solar Photovoltaic Installation under the Programme of NEM Rakyat and NEM GoMEn in Peninsular Malaysia, revision of 20 September 2024Amends NEM Rakyat & GoMEn Guidelines.
-
Guidelines for Solar Photovoltaic Installation under the Programme of NEM Rakyat and NEM GoMEn in Peninsular Malaysia, revision of 25 November 2024Amends NEM Rakyat & GoMEn Guidelines.
-
Guidelines for Solar Photovoltaic Installation under the Programme of NEM Rakyat and NEM GoMEn in Peninsular Malaysia, revision of 1 March 2025Amends NEM Rakyat & GoMEn Guidelines.
-
NEM Rakyat & GoMEn Guidelines Pin.1/2026 (this rule) 19 Aug 2026 in forceGuidelines for Solar Photovoltaic Installation under the Programme of NEM Rakyat and NEM GoMEn in Peninsular Malaysia, 2026 revisionAmends NEM Rakyat & GoMEn Guidelines.
Related rules in Malaysia
Change log
-
Added to the tracker.
Cite this entry
NEM Rakyat & GoMEn Guidelines Pin.1/2026, “Guidelines for Solar Photovoltaic Installation under the Programme of NEM Rakyat and NEM GoMEn in Peninsular Malaysia, 2026 revision”. Energy Commission (Suruhanjaya Tenaga), Malaysia, signed 19 Aug 2026. In: Power Transformation Lab Policy Tracker, status checked 4 Nov 2026. https://power-lab.github.io/policy-tracker/rules/my-gp-2021-27-rev7/