Malaysia · regulator determination · GP/ST/No.27/2021
Guidelines for Solar Photovoltaic Installation under the Programme of NEM Rakyat and NEM GoMEn in Peninsular Malaysia, revision of 15 July 2023
Guidelines for Solar Photovoltaic Installation under the Programme of NEM Rakyat and NEM GoMEn in Peninsular Malaysia
Summary
Revision of the NEM Rakyat and NEM GoMEn guidelines, dated 15 July 2023, that topped up the programme quota. The size of the top-up is not recorded.
Reviewer notes: Scouted from desk research (high confidence). Version date 15 July 2023 from the registration record; effective date not confirmed. The report says the 2023-2025 revisions were each a quota top-up, but the size of this one and its revision label are not recorded, so number repeats the base number. The URL holds the current consolidated text, which ST overwrites on each revision; this version's own text is not archived.
History
All instruments linked to this one by amendment, revocation or partial override, in order of signature. Select an instrument to open its entry.
revokes or replaces amends overrides in part in force amended pending draft replaced revoked expired
-
Guidelines for Solar Photovoltaic Installation under the Programme of NEM Rakyat and NEM GoMEn in Peninsular Malaysia
-
NEM Rakyat & GoMEn Guidelines rev. 2023-07 (this rule) 15 Jul 2023 in forceGuidelines for Solar Photovoltaic Installation under the Programme of NEM Rakyat and NEM GoMEn in Peninsular Malaysia, revision of 15 July 2023Amends NEM Rakyat & GoMEn Guidelines.
-
Guidelines for Solar Photovoltaic Installation under the Programme of NEM Rakyat and NEM GoMEn in Peninsular Malaysia, revision of 5 February 2024Amends NEM Rakyat & GoMEn Guidelines.
-
Guidelines for Solar Photovoltaic Installation under the Programme of NEM Rakyat and NEM GoMEn in Peninsular Malaysia, revision of 1 April 2024Amends NEM Rakyat & GoMEn Guidelines.
-
Guidelines for Solar Photovoltaic Installation under the Programme of NEM Rakyat and NEM GoMEn in Peninsular Malaysia, revision of 20 September 2024Amends NEM Rakyat & GoMEn Guidelines.
-
Guidelines for Solar Photovoltaic Installation under the Programme of NEM Rakyat and NEM GoMEn in Peninsular Malaysia, revision of 25 November 2024Amends NEM Rakyat & GoMEn Guidelines.
-
Guidelines for Solar Photovoltaic Installation under the Programme of NEM Rakyat and NEM GoMEn in Peninsular Malaysia, revision of 1 March 2025Amends NEM Rakyat & GoMEn Guidelines.
-
Guidelines for Solar Photovoltaic Installation under the Programme of NEM Rakyat and NEM GoMEn in Peninsular Malaysia, 2026 revisionAmends NEM Rakyat & GoMEn Guidelines.
Related rules in Malaysia
Change log
-
Added to the tracker.
Cite this entry
NEM Rakyat & GoMEn Guidelines rev. 2023-07, “Guidelines for Solar Photovoltaic Installation under the Programme of NEM Rakyat and NEM GoMEn in Peninsular Malaysia, revision of 15 July 2023”. Energy Commission (Suruhanjaya Tenaga), Malaysia, signed 15 Jul 2023. In: Power Transformation Lab Policy Tracker, status checked 4 Nov 2026. https://power-lab.github.io/policy-tracker/rules/my-gp-2021-27-rev1/