Malaysia · regulator determination · GP/ST/No.27/2021

Guidelines for Solar Photovoltaic Installation under the Programme of NEM Rakyat and NEM GoMEn in Peninsular Malaysia, revision of 5 February 2024

Guidelines for Solar Photovoltaic Installation under the Programme of NEM Rakyat and NEM GoMEn in Peninsular Malaysia

in force unverified

Summary

Revision of the NEM Rakyat and NEM GoMEn guidelines, dated 5 February 2024, that topped up the programme quota. The size of the top-up is not recorded.

Not yet verified. This entry has not been fully checked against the official text. Confirm the status and links before relying on it.

Reviewer notes: Scouted from desk research (high confidence). Version date 5 February 2024 from the registration record; effective date not confirmed. The report says the 2023-2025 revisions were each a quota top-up, but the size of this one and its revision label are not recorded, so number repeats the base number. The URL holds the current consolidated text, which ST overwrites on each revision; this version's own text is not archived.

History

All instruments linked to this one by amendment, revocation or partial override, in order of signature. Select an instrument to open its entry.

2021202220232024202520262027NEM Rakyat & GoMEn Guidelines: amended, signed 29 Jan 2021NEM Rakyat & GoMEn GuidelinesNEM Rakyat & GoMEn Guidelines rev. 2023-07: in force, signed 15 Jul 2023NEM Rakyat & GoMEn Guidelines rev. 2023-07NEM Rakyat & GoMEn Guidelines rev. 2024-02: in force, signed 5 Feb 2024NEM Rakyat & GoMEn Guidelines rev. 2024-02NEM Rakyat & GoMEn Guidelines rev. 2024-04: in force, signed 1 Apr 2024NEM Rakyat & GoMEn Guidelines rev. 2024-04NEM Rakyat & GoMEn Guidelines rev. 2024-09: in force, signed 20 Sep 2024NEM Rakyat & GoMEn Guidelines rev. 2024-09NEM Rakyat & GoMEn Guidelines rev. 2024-11: in force, signed 25 Nov 2024NEM Rakyat & GoMEn Guidelines rev. 2024-11NEM Rakyat & GoMEn Guidelines rev. 2025-03: in force, signed 1 Mar 2025NEM Rakyat & GoMEn Guidelines rev. 2025-03NEM Rakyat & GoMEn Guidelines Pin.1/2026: in force, signed 19 Aug 2026NEM Rakyat & GoMEn Guidelines Pin.1/2026

revokes or replaces amends overrides in part in force amended pending draft replaced revoked expired

  1. NEM Rakyat & GoMEn Guidelines 29 Jan 2021 amended
    Guidelines for Solar Photovoltaic Installation under the Programme of NEM Rakyat and NEM GoMEn in Peninsular Malaysia
  2. Guidelines for Solar Photovoltaic Installation under the Programme of NEM Rakyat and NEM GoMEn in Peninsular Malaysia, revision of 15 July 2023
  3. NEM Rakyat & GoMEn Guidelines rev. 2024-02 (this rule) 5 Feb 2024 in force
    Guidelines for Solar Photovoltaic Installation under the Programme of NEM Rakyat and NEM GoMEn in Peninsular Malaysia, revision of 5 February 2024
  4. Guidelines for Solar Photovoltaic Installation under the Programme of NEM Rakyat and NEM GoMEn in Peninsular Malaysia, revision of 1 April 2024
  5. Guidelines for Solar Photovoltaic Installation under the Programme of NEM Rakyat and NEM GoMEn in Peninsular Malaysia, revision of 20 September 2024
  6. Guidelines for Solar Photovoltaic Installation under the Programme of NEM Rakyat and NEM GoMEn in Peninsular Malaysia, revision of 25 November 2024
  7. Guidelines for Solar Photovoltaic Installation under the Programme of NEM Rakyat and NEM GoMEn in Peninsular Malaysia, revision of 1 March 2025
  8. Guidelines for Solar Photovoltaic Installation under the Programme of NEM Rakyat and NEM GoMEn in Peninsular Malaysia, 2026 revision

Related rules in Malaysia

Change log

  1. Added to the tracker.

Cite this entry

NEM Rakyat & GoMEn Guidelines rev. 2024-02, “Guidelines for Solar Photovoltaic Installation under the Programme of NEM Rakyat and NEM GoMEn in Peninsular Malaysia, revision of 5 February 2024”. Energy Commission (Suruhanjaya Tenaga), Malaysia, signed 5 Feb 2024. In: Power Transformation Lab Policy Tracker, status checked 4 Nov 2026. https://power-lab.github.io/policy-tracker/rules/my-gp-2021-27-rev2/