Malaysia · regulator determination · GP/ST/No.51/2024 (Pin.1/2026)

Guidelines for Solar Photovoltaic Installation for Self-Consumption in Peninsular Malaysia, 2026 revision

Guidelines for Solar Photovoltaic Installation for Self-Consumption in Peninsular Malaysia (Pin.1/2026)

in force unverified

Summary

Revision of the SELCO guidelines that introduces a new definition of "premise".

Not yet verified. This entry has not been fully checked against the official text. Confirm the status and links before relying on it.

Reviewer notes: Scouted from desk research (high confidence). Revision dated 15 Jun 2026 and signed 21 Jul 2026; date_in_force uses the 15 Jun 2026 revision date, which precedes signing, so check it. The URL holds the current consolidated text, which ST overwrites on each revision; this version's own text is not archived.

History

All instruments linked to this one by amendment, revocation or partial override, in order of signature. Select an instrument to open its entry.

2024202520262027SELCO Guidelines: amended, signed 2024SELCO GuidelinesSELCO Guidelines Pin.2025: in force, signed 27 Mar 2025SELCO Guidelines Pin.2025SELCO Guidelines Pin.1/2026: in force, signed 21 Jul 2026SELCO Guidelines Pin.1/2026

revokes or replaces amends overrides in part in force amended pending draft replaced revoked expired

  1. SELCO Guidelines 2024 amended
    Guidelines for Solar Photovoltaic Installation for Self-Consumption (SELCO) in Peninsular Malaysia
  2. SELCO Guidelines Pin.2025 27 Mar 2025 in force
    Guidelines for Solar Photovoltaic Installation for Self-Consumption in Peninsular Malaysia, 2025 revision
  3. SELCO Guidelines Pin.1/2026 (this rule) 21 Jul 2026 in force
    Guidelines for Solar Photovoltaic Installation for Self-Consumption in Peninsular Malaysia, 2026 revision

Related rules in Malaysia

Change log

  1. Added to the tracker.

Cite this entry

SELCO Guidelines Pin.1/2026, “Guidelines for Solar Photovoltaic Installation for Self-Consumption in Peninsular Malaysia, 2026 revision”. Energy Commission (Suruhanjaya Tenaga), Malaysia, signed 21 Jul 2026. In: Power Transformation Lab Policy Tracker, status checked 4 Nov 2026. https://power-lab.github.io/policy-tracker/rules/my-gp-2024-51-rev2/