Malaysia · regulator determination · GP/ST/No.28/2021

Guidelines for Solar Photovoltaic Installation under Net Offset Virtual Aggregation (NOVA) Programme in Peninsular Malaysia, revision of 1 March 2025

Guidelines for Solar Photovoltaic Installation under Net Offset Virtual Aggregation (NOVA) Programme in Peninsular Malaysia

in force unverified

Summary

Revision of the NOVA guidelines, dated 1 March 2025, that added 300 MW to the programme quota.

Not yet verified. This entry has not been fully checked against the official text. Confirm the status and links before relying on it.

Reviewer notes: Scouted from desk research (high confidence). Version date 1 March 2025 from the registration record; effective date and revision label not recorded, so number repeats the base number. The URL holds the current consolidated text, which ST overwrites on each revision; this version's own text is not archived.

History

All instruments linked to this one by amendment, revocation or partial override, in order of signature. Select an instrument to open its entry.

2021202220232024202520262027NOVA Guidelines: amended, signed 29 Jan 2021NOVA GuidelinesNOVA Guidelines rev. 2023-07: in force, signed 15 Jul 2023NOVA Guidelines rev. 2023-07NOVA Guidelines rev. 2024-02: in force, signed 5 Feb 2024NOVA Guidelines rev. 2024-02NOVA Guidelines rev. 2024-11: in force, signed 25 Nov 2024NOVA Guidelines rev. 2024-11NOVA Guidelines rev. 2025-03: in force, signed 1 Mar 2025NOVA Guidelines rev. 2025-03NOVA Guidelines Pin.1/2026: in force, signed 23 Jul 2026NOVA Guidelines Pin.1/2026

revokes or replaces amends overrides in part in force amended pending draft replaced revoked expired

  1. NOVA Guidelines 29 Jan 2021 amended
    Guidelines for Solar Photovoltaic Installation under Net Offset Virtual Aggregation (NOVA) Programme in Peninsular Malaysia
  2. NOVA Guidelines rev. 2023-07 15 Jul 2023 in force
    Guidelines for Solar Photovoltaic Installation under Net Offset Virtual Aggregation (NOVA) Programme in Peninsular Malaysia, revision of 15 July 2023
    Amends NOVA Guidelines.
  3. NOVA Guidelines rev. 2024-02 5 Feb 2024 in force
    Guidelines for Solar Photovoltaic Installation under Net Offset Virtual Aggregation (NOVA) Programme in Peninsular Malaysia, revision of 5 February 2024
    Amends NOVA Guidelines.
  4. NOVA Guidelines rev. 2024-11 25 Nov 2024 in force
    Guidelines for Solar Photovoltaic Installation under Net Offset Virtual Aggregation (NOVA) Programme in Peninsular Malaysia, revision of 25 November 2024
    Amends NOVA Guidelines.
  5. NOVA Guidelines rev. 2025-03 (this rule) 1 Mar 2025 in force
    Guidelines for Solar Photovoltaic Installation under Net Offset Virtual Aggregation (NOVA) Programme in Peninsular Malaysia, revision of 1 March 2025
    Amends NOVA Guidelines.
  6. NOVA Guidelines Pin.1/2026 23 Jul 2026 in force
    Guidelines for Solar Photovoltaic Installation under Net Offset Virtual Aggregation (NOVA) Programme in Peninsular Malaysia, 2026 revision
    Amends NOVA Guidelines.

Related rules in Malaysia

Change log

  1. Added to the tracker.

Cite this entry

NOVA Guidelines rev. 2025-03, “Guidelines for Solar Photovoltaic Installation under Net Offset Virtual Aggregation (NOVA) Programme in Peninsular Malaysia, revision of 1 March 2025”. Energy Commission (Suruhanjaya Tenaga), Malaysia, signed 1 Mar 2025. In: Power Transformation Lab Policy Tracker, status checked 4 Nov 2026. https://power-lab.github.io/policy-tracker/rules/my-gp-2021-28-rev4/