Malaysia · regulator determination · GP/ST/No.28/2021
Guidelines for Solar Photovoltaic Installation under Net Offset Virtual Aggregation (NOVA) Programme in Peninsular Malaysia, revision of 25 November 2024
Guidelines for Solar Photovoltaic Installation under Net Offset Virtual Aggregation (NOVA) Programme in Peninsular Malaysia
Summary
Revision of the NOVA guidelines, dated 25 November 2024, that added 300 MW to the programme quota.
Reviewer notes: Scouted from desk research (high confidence). Version date 25 November 2024 from the registration record; effective date and revision label not recorded, so number repeats the base number. The URL holds the current consolidated text, which ST overwrites on each revision; this version's own text is not archived.
History
All instruments linked to this one by amendment, revocation or partial override, in order of signature. Select an instrument to open its entry.
revokes or replaces amends overrides in part in force amended pending draft replaced revoked expired
-
Guidelines for Solar Photovoltaic Installation under Net Offset Virtual Aggregation (NOVA) Programme in Peninsular Malaysia
-
Guidelines for Solar Photovoltaic Installation under Net Offset Virtual Aggregation (NOVA) Programme in Peninsular Malaysia, revision of 15 July 2023Amends NOVA Guidelines.
-
Guidelines for Solar Photovoltaic Installation under Net Offset Virtual Aggregation (NOVA) Programme in Peninsular Malaysia, revision of 5 February 2024Amends NOVA Guidelines.
-
NOVA Guidelines rev. 2024-11 (this rule) 25 Nov 2024 in forceGuidelines for Solar Photovoltaic Installation under Net Offset Virtual Aggregation (NOVA) Programme in Peninsular Malaysia, revision of 25 November 2024Amends NOVA Guidelines.
-
Guidelines for Solar Photovoltaic Installation under Net Offset Virtual Aggregation (NOVA) Programme in Peninsular Malaysia, revision of 1 March 2025Amends NOVA Guidelines.
-
Guidelines for Solar Photovoltaic Installation under Net Offset Virtual Aggregation (NOVA) Programme in Peninsular Malaysia, 2026 revisionAmends NOVA Guidelines.
Related rules in Malaysia
Change log
-
Added to the tracker.
Cite this entry
NOVA Guidelines rev. 2024-11, “Guidelines for Solar Photovoltaic Installation under Net Offset Virtual Aggregation (NOVA) Programme in Peninsular Malaysia, revision of 25 November 2024”. Energy Commission (Suruhanjaya Tenaga), Malaysia, signed 25 Nov 2024. In: Power Transformation Lab Policy Tracker, status checked 4 Nov 2026. https://power-lab.github.io/policy-tracker/rules/my-gp-2021-28-rev3/