Malaysia · regulator determination · GP/ST/No.40/2024
Guidelines for Corporate Renewable Energy Supply Scheme (CRESS)
Guidelines for Corporate Renewable Energy Supply Scheme (CRESS)
Summary
Sets up third-party access in Peninsular Malaysia: a renewable energy developer can supply a green consumer over TNB's network and pays the Single Buyer a system access charge. The charge was 25 sen/kWh for firm and 45 sen/kWh for non-firm supply at launch, and PETRA reduced it to 20 and 40 sen for RP4 on 29 August 2025. 51% local ownership is a licence condition.
Reviewer notes: Scouted from desk research (high confidence). Registered guideline under s.50C of Act 447. First version effective 20 Sep 2024 (Skrine); no separate signing date recorded, so date_signed repeats it. Revised twice (rows -REV1, -REV2). The 29 Aug 2025 SAC cut was a PETRA press release (PETRA.100-9/1/4 JLD.1 (39); not a row); check whether a revision codified it. See also MY-DEC-2026-CAP.
History
All instruments linked to this one by amendment, revocation or partial override, in order of signature. Select an instrument to open its entry.
revokes or replaces amends overrides in part in force amended pending draft replaced revoked expired
-
CRESS Guidelines (this rule) 20 Sep 2024 amendedGuidelines for Corporate Renewable Energy Supply Scheme (CRESS)
-
Guidelines for Corporate Renewable Energy Supply Scheme (CRESS), second version (March 2025)Amends CRESS Guidelines.
-
Guidelines for Corporate Renewable Energy Supply Scheme (CRESS), third version (December 2025)Amends CRESS Guidelines.
Implementation
This rule implements Act 447.
Related rules in Malaysia
Change log
-
Added to the tracker.
Cite this entry
CRESS Guidelines, “Guidelines for Corporate Renewable Energy Supply Scheme (CRESS)”. Energy Commission (Suruhanjaya Tenaga), Malaysia, signed 20 Sep 2024. In: Power Transformation Lab Policy Tracker, status checked 4 Nov 2026. https://power-lab.github.io/policy-tracker/rules/my-gp-2024-40/