Malaysia · regulator determination · GP/ST/No.40/2024
Guidelines for Corporate Renewable Energy Supply Scheme (CRESS), second version (March 2025)
Guidelines for Corporate Renewable Energy Supply Scheme (CRESS)
Summary
Second version of the CRESS guidelines, dated 1 March 2025. The scouting did not record what it changed.
Reviewer notes: Scouted from desk research (high confidence). Version date 1 Mar 2025; effective date and revision label not recorded, so number repeats the base number. Content of the revision not reviewed. The URL holds the current consolidated text, which ST overwrites on each revision; this version's own text is not archived.
History
All instruments linked to this one by amendment, revocation or partial override, in order of signature. Select an instrument to open its entry.
revokes or replaces amends overrides in part in force amended pending draft replaced revoked expired
-
Guidelines for Corporate Renewable Energy Supply Scheme (CRESS)
-
CRESS Guidelines Mar 2025 (this rule) 1 Mar 2025 in forceGuidelines for Corporate Renewable Energy Supply Scheme (CRESS), second version (March 2025)Amends CRESS Guidelines.
-
Guidelines for Corporate Renewable Energy Supply Scheme (CRESS), third version (December 2025)Amends CRESS Guidelines.
Related rules in Malaysia
Change log
-
Added to the tracker.
Cite this entry
CRESS Guidelines Mar 2025, “Guidelines for Corporate Renewable Energy Supply Scheme (CRESS), second version (March 2025)”. Energy Commission (Suruhanjaya Tenaga), Malaysia, signed 1 Mar 2025. In: Power Transformation Lab Policy Tracker, status checked 4 Nov 2026. https://power-lab.github.io/policy-tracker/rules/my-gp-2024-40-rev1/