Malaysia · regulator determination · GP/ST/No.40/2024 (Pindaan 2025)
Guidelines for Corporate Renewable Energy Supply Scheme (CRESS), third version (December 2025)
Guidelines for Corporate Renewable Energy Supply Scheme (CRESS) (Pindaan 2025)
Summary
Third version of the CRESS guidelines, in effect from 29 December 2025. The scouting did not record what it changed.
Reviewer notes: Scouted from desk research (high confidence). Signed 26 Dec 2025; version date 29 Dec 2025; listed by ST 6 Jan 2026. The 'Pindaan 2025' label is on the current PDF; check that it belongs to this version and not to the March 2025 one. Content of the revision not reviewed. The URL holds the current consolidated text, which ST overwrites on each revision; this version's own text is not archived.
History
All instruments linked to this one by amendment, revocation or partial override, in order of signature. Select an instrument to open its entry.
revokes or replaces amends overrides in part in force amended pending draft replaced revoked expired
-
Guidelines for Corporate Renewable Energy Supply Scheme (CRESS)
-
Guidelines for Corporate Renewable Energy Supply Scheme (CRESS), second version (March 2025)Amends CRESS Guidelines.
-
CRESS Guidelines Pindaan 2025 (this rule) 26 Dec 2025 in forceGuidelines for Corporate Renewable Energy Supply Scheme (CRESS), third version (December 2025)Amends CRESS Guidelines.
Related rules in Malaysia
Change log
-
Added to the tracker.
Cite this entry
CRESS Guidelines Pindaan 2025, “Guidelines for Corporate Renewable Energy Supply Scheme (CRESS), third version (December 2025)”. Energy Commission (Suruhanjaya Tenaga), Malaysia, signed 26 Dec 2025. In: Power Transformation Lab Policy Tracker, status checked 4 Nov 2026. https://power-lab.github.io/policy-tracker/rules/my-gp-2024-40-rev2/