Malaysia · regulator determination · GP/ST/No.12/2017 (Pin.2019)
Guidelines for New Enhanced Dispatch Arrangement (NEDA), 2019 revision
Guidelines for New Enhanced Dispatch Arrangement (Pin.2019)
Summary
Revision of the NEDA guidelines that allows solar power producers to participate in the arrangement.
Reviewer notes: Scouted from desk research (high confidence). Version date 28 May 2019 from the registration record; effective date not confirmed. The URL holds the current consolidated text, which ST overwrites on each revision; this version's own text is not archived.
History
All instruments linked to this one by amendment, revocation or partial override, in order of signature. Select an instrument to open its entry.
revokes or replaces amends overrides in part in force amended pending draft replaced revoked expired
-
Guidelines for New Enhanced Dispatch Arrangement (NEDA)
-
NEDA Guidelines Pin.2019 (this rule) 28 May 2019 in forceGuidelines for New Enhanced Dispatch Arrangement (NEDA), 2019 revisionAmends NEDA Guidelines.
-
Guidelines for New Enhanced Dispatch Arrangement (NEDA), second 2019 revisionAmends NEDA Guidelines.
-
Guidelines for New Enhanced Dispatch Arrangement (NEDA), 2024 revisionAmends NEDA Guidelines.
-
Guidelines for New Enhanced Dispatch Arrangement (NEDA), 2025 revisionAmends NEDA Guidelines.
Related rules in Malaysia
Change log
-
Added to the tracker.
Cite this entry
NEDA Guidelines Pin.2019, “Guidelines for New Enhanced Dispatch Arrangement (NEDA), 2019 revision”. Energy Commission (Suruhanjaya Tenaga), Malaysia, signed 28 May 2019. In: Power Transformation Lab Policy Tracker, status checked 4 Nov 2026. https://power-lab.github.io/policy-tracker/rules/my-gp-2017-12-rev1/