Malaysia · regulator determination · GP/ST/No.56/2025

Guidelines on Electricity Tariff Determination under Incentive-Based Regulation (IBR) for Peninsular Malaysia 2025

Guidelines on Electricity Tariff Determination under Incentive-Based Regulation (IBR) for Peninsular Malaysia 2025

in force unverified

Summary

Sets the incentive-based regulation method for TNB's tariffs in Peninsular Malaysia for Regulatory Period 4 (RP4). It covers the revenue cap, the base average tariff, the Automatic Fuel Adjustment (section 7), the allowed return (WACC) and efficiency carry-over.

Not yet verified. This entry has not been fully checked against the official text. Confirm the status and links before relying on it.

Reviewer notes: Scouted from desk research (high confidence). Issued under ss.26 and 50C of Act 447. Listed by ST on 28 Jul 2025; signature date not found in the PDF, so only the year is given (date medium confidence). Probably supersedes the IBR guidelines of 2018, 2021 and 2022 (still listed; not rows); not confirmed. The AFA claims guideline GP/ST/No.53/2024 (Pindaan 2025, Malay only) is not a row.

History

No amendment or revocation links are recorded for this rule yet.

Implementation

This rule implements Act 447.

Related rules in Malaysia

Change log

  1. Added to the tracker.

Cite this entry

IBR Guidelines 2025 (Peninsular), “Guidelines on Electricity Tariff Determination under Incentive-Based Regulation (IBR) for Peninsular Malaysia 2025”. Energy Commission (Suruhanjaya Tenaga), Malaysia, signed 2025. In: Power Transformation Lab Policy Tracker, status checked 4 Nov 2026. https://power-lab.github.io/policy-tracker/rules/my-gp-2025-56/