Malaysia · regulator determination · GP/ST/No.38/2023
Guidelines on Green Electricity Tariff (GET), revision of 31 January 2025
Guidelines on Green Electricity Tariff
Summary
Revision of the GET guidelines dated 31 January 2025. The scouting did not record what it changed.
Reviewer notes: Scouted from desk research (high confidence). Version date 31 Jan 2025 from the registration record; effective date, revision label and content not recorded. The URL holds the current consolidated text, which ST overwrites on each revision; this version's own text is not archived.
History
All instruments linked to this one by amendment, revocation or partial override, in order of signature. Select an instrument to open its entry.
revokes or replaces amends overrides in part in force amended pending draft replaced revoked expired
-
Guidelines on Green Electricity Tariff (GET)
-
Guidelines on Green Electricity Tariff (GET), revision of 25 November 2024Amends GET Guidelines.
-
GET Guidelines rev. 2025-01 (this rule) 31 Jan 2025 in forceGuidelines on Green Electricity Tariff (GET), revision of 31 January 2025Amends GET Guidelines.
-
Guidelines on Green Electricity Tariff (GET), revision of 14 July 2025Amends GET Guidelines.
Related rules in Malaysia
Change log
-
Added to the tracker.
Cite this entry
GET Guidelines rev. 2025-01, “Guidelines on Green Electricity Tariff (GET), revision of 31 January 2025”. Energy Commission (Suruhanjaya Tenaga), Malaysia, signed 31 Jan 2025. In: Power Transformation Lab Policy Tracker, status checked 4 Nov 2026. https://power-lab.github.io/policy-tracker/rules/my-gp-2023-38-rev2/