Sets up procurement of up to 5,203 MW of renewable power at the 2022-2030 feed-in tariff: biogas 335 MW, wind 1,500 MW, ground-mounted solar 2,368 MW and solar with storage 1,000 MW. The first round selected 175 projects of about 4,852 MW.
Reviewer notes: Scouted from desk research (high confidence). Thai title to be added. 27 Sep 2022 is the Government Gazette date; signing date and date in force not confirmed. MW split per Baker McKenzie. Implements link inferred from the report (same scheme, period and rates as NEPC 3/2565); check the preamble. The 2024 ERC regulation for the 3,668.5 MW round has no row yet.
History
No amendment or revocation links are recorded for this rule yet.
Implementation
This rule implements NEPC 2022-05 FiT rates.
Related rules in Thailand
Change log
-
Added to the tracker.
Cite this entry
ERC FiT Reg. 2022, “ERC Regulation on procurement of renewable electricity under the FiT scheme 2022-2030 for the group without fuel costs B.E. 2565 (2022)”. Energy Regulatory Commission (ERC), Thailand, signed 27 Sep 2022. In: Power Transformation Lab Policy Tracker, status checked 4 Nov 2026. https://power-lab.github.io/policy-tracker/rules/th-erc-2022-fit-2022-2030/