Indonesia · ministerial regulation · 50/2017
MEMR Regulation 50/2017 on Use of Renewable Energy for Electricity Supply
Peraturan Menteri ESDM Nomor 50 Tahun 2017 tentang Pemanfaatan Sumber Energi Terbarukan untuk Penyediaan Tenaga Listrik
Summary
Consolidated renewable pricing into one regulation, keeping prices benchmarked to regional and national BPP, and added build-own-operate-transfer terms. It replaced Regulations 12/2017 and 43/2017.
Reviewer notes: Its pricing articles are overridden in practice by Presidential Regulation 112/2022, which does not formally revoke it. Seed row drafted from secondary knowledge; check every field against the official text.
History
All instruments linked to this one by amendment, revocation or partial override, in order of signature. Select an instrument to open its entry.
revokes or replaces amends overrides in part in force amended pending draft replaced revoked expired
-
MEMR Regulation 12/2017 on Use of Renewable Energy for Electricity Supply
-
MEMR Regulation 43/2017 amending Regulation 12/2017Amends Permen ESDM 12/2017.
-
Permen ESDM 50/2017 (this rule) Aug 2017 amendedMEMR Regulation 50/2017 on Use of Renewable Energy for Electricity SupplyRevokes Permen ESDM 12/2017, Permen ESDM 43/2017.
-
MEMR Regulation 53/2018 amending Regulation 50/2017Amends Permen ESDM 50/2017.
-
MEMR Regulation 4/2020, second amendment to Regulation 50/2017Amends Permen ESDM 50/2017.
-
Presidential Regulation 112/2022 on Accelerating Renewable Energy for Electricity SupplyOverrides in part Permen ESDM 50/2017.
Related rules in Indonesia
Change log
-
Added to the tracker.
Cite this entry
Permen ESDM 50/2017, “MEMR Regulation 50/2017 on Use of Renewable Energy for Electricity Supply”. Ministry of Energy and Mineral Resources (ESDM), Indonesia, signed Aug 2017. In: Power Transformation Lab Policy Tracker, status checked 3 Nov 2026. https://power-lab.github.io/policy-tracker/rules/id-permen-esdm-2017-50/