United States · regulator determination · Order No. 1920 (89 FR 49280)

Building for the Future Through Electric Regional Transmission Planning and Cost Allocation

Building for the Future Through Electric Regional Transmission Planning and Cost Allocation

amended unverified

Summary

Revises the pro forma open access transmission tariff to require long-term regional transmission planning, with selection and cost allocation of regional transmission solutions to long-term needs, and to require consideration of alternative transmission technologies and better coordination with interconnection.

Not yet verified. This entry has not been fully checked against the official text. Confirm the status and links before relying on it.

Reviewer notes: Scouted from desk research (medium confidence). Citation and effective date from the Federal Register API; issuance date 2024-05-13 from general knowledge. Orders 1920-A (89 FR 97174, 2024-12-06) and 1920-B (90 FR 17692, 2025-04-28) not recorded. Appeals pending (secondary knowledge); check.

History

No amendment or revocation links are recorded for this rule yet.

Related rules in United States

Change log

  1. Added to the tracker.

Cite this entry

FERC Order 1920 long-term transmission planning, “Building for the Future Through Electric Regional Transmission Planning and Cost Allocation”. Federal Energy Regulatory Commission, United States, signed 13 May 2024. In: Power Transformation Lab Policy Tracker, status checked 19 Nov 2026. https://power-lab.github.io/policy-tracker/rules/us-ferc-2024-1920/