Thailand · decision · unnumbered (Cabinet resolution)

Cabinet resolution approving measures to promote the use of electric vehicles (EV 3.0)

Cabinet resolution approving measures to promote the use of electric vehicles (EV 3.0)

amended unverified

Summary

Approves 2022-2023 purchase subsidies for battery EVs (up to THB 150,000 per car depending on battery size), excise tax cuts (8% to 2% for cars) and reduced customs duties on imported BEVs, in return for manufacturers committing to build EVs in Thailand to offset imports.

Not yet verified. This entry has not been fully checked against the official text. Confirm the status and links before relying on it.

Reviewer notes: Scouted from desk research (medium confidence). Thai title to be added. Content from press and KPMG. Implemented by an Excise Department notification (2022-03-21 per KPMG) and Ministry of Finance customs notifications; neither has a row. Amended by the 2025-12-09 Cabinet adjustments.

History

All instruments linked to this one by amendment, revocation or partial override, in order of signature. Select an instrument to open its entry.

20222023202420252026EV 3.0 package: amended, signed 15 Feb 2022EV 3.0 packageEV 3.5 package: amended, signed 19 Dec 2023EV 3.5 packageEV3/EV3.5 adjustments 2025: in force, signed 9 Dec 2025EV3/EV3.5 adjustments 2025

revokes or replaces amends overrides in part in force amended pending draft replaced revoked expired

  1. EV 3.0 package (this rule) 15 Feb 2022 amended
    Cabinet resolution approving measures to promote the use of electric vehicles (EV 3.0)
  2. EV 3.5 package 19 Dec 2023 amended
    Cabinet resolution on measures to promote electric vehicles, phase 2 (EV 3.5), 2024-2027
  3. EV3/EV3.5 adjustments 2025 9 Dec 2025 in force
    Cabinet resolution adjusting the EV 3 and EV 3.5 measures

Related rules in Thailand

Change log

  1. Added to the tracker.

Cite this entry

EV 3.0 package, “Cabinet resolution approving measures to promote the use of electric vehicles (EV 3.0)”. Cabinet (Council of Ministers), Thailand, signed 15 Feb 2022. In: Power Transformation Lab Policy Tracker, status checked 19 Nov 2026. https://power-lab.github.io/policy-tracker/rules/th-cab-2022-ev3/