Thailand · decision · 2/2568 (172)
NEPC resolution on managing Mae Moh power plant, replacing units 8-9
NEPC resolution on managing Mae Moh power plant, replacing units 8-9
Summary
Extends the life of Mae Moh lignite units 8 and 11 to 2031 instead of the end of 2025. Units 12 and 13 are to be refurbished and run to 2048.
Reviewer notes: Scouted from desk research (high confidence). Thai title to be added. Units 9-10 reportedly restarted in March 2026 (GEM wiki, unconfirmed). Meeting date 21 Aug 2025 (EPPO portal) vs 23 Aug (Pattaya Mail). Link basis not checked against the text: the report says it amends or replaces the earlier row. date_in_force taken as the meeting date.
History
All instruments linked to this one by amendment, revocation or partial override, in order of signature. Select an instrument to open its entry.
revokes or replaces amends overrides in part in force amended pending draft replaced revoked expired
-
NEPC resolution postponing the retirement of Mae Moh lignite units 8-11
-
NEPC 2025-08 Mae Moh (this rule) 21 Aug 2025 in forceNEPC resolution on managing Mae Moh power plant, replacing units 8-9Amends NEPC 2022-06 Mae Moh.
Change log
-
Added to the tracker.
Cite this entry
NEPC 2025-08 Mae Moh, “NEPC resolution on managing Mae Moh power plant, replacing units 8-9”. National Energy Policy Council (NEPC), Thailand, signed 21 Aug 2025. In: Power Transformation Lab Policy Tracker, status checked 4 Nov 2026. https://power-lab.github.io/policy-tracker/rules/th-nepc-2025-2-mae-moh/