Bangladesh · circular · unnumbered (Net Metering Guidelines 2018)

Net Metering Guidelines 2018

Net Metering Guidelines 2018

replaced unverified

Summary

Allowed three-phase consumers to connect rooftop solar to the distribution grid under net metering, capped as a share of sanctioned load, with surplus energy credited against later consumption.

Not yet verified. This entry has not been fully checked against the official text. Confirm the status and links before relying on it.

Reviewer notes: Scouted from desk research (medium confidence). Approval date per IEEFA (others say July 2018 or later); revised in 2019 (not recorded). URL is an ESMAP copy of the English translation (November 2018 cover). 70% sanctioned-load cap per press. Official Bengali text on SREDA/Power Division not reached (SREDA TLS error).

History

All instruments linked to this one by amendment, revocation or partial override, in order of signature. Select an instrument to open its entry.

201820192020202120222023202420252026Net Metering Guidelines 2018: replaced, signed 28 Jul 2018Net Metering Guidelines 2018Net Metering Guideline 2025: in force, signed —Net Metering Guideline 2025

revokes or replaces amends overrides in part in force amended pending draft replaced revoked expired

  1. Net Metering Guidelines 2018 (this rule) 28 Jul 2018 replaced
    Net Metering Guidelines 2018
  2. Net Metering Guideline 2025

Related rules in Bangladesh

Change log

  1. Added to the tracker.

Cite this entry

Net Metering Guidelines 2018, “Net Metering Guidelines 2018”. Ministry of Power, Energy and Mineral Resources (Power Division), Bangladesh, signed 28 Jul 2018. In: Power Transformation Lab Policy Tracker, status checked 19 Nov 2026. https://power-lab.github.io/policy-tracker/rules/bd-gl-2018-netmeter/