Bangladesh · circular · unnumbered (Net Metering Guideline 2025)

Net Metering Guideline 2025

Net Metering Guideline 2025

in force unverified

Summary

Replaces the 2018 guidelines, raising the cap for net-metered rooftop solar to 100% of sanctioned load and opening net metering to single-phase consumers.

Not yet verified. This entry has not been fully checked against the official text. Confirm the status and links before relying on it.

Reviewer notes: Scouted from desk research (medium confidence). Month from bdnews24 and pv magazine (secondary); official text not located. Check exact issue date and whether it expressly replaces the 2018/2019 guidelines.

History

All instruments linked to this one by amendment, revocation or partial override, in order of signature. Select an instrument to open its entry.

201820192020202120222023202420252026Net Metering Guidelines 2018: replaced, signed 28 Jul 2018Net Metering Guidelines 2018Net Metering Guideline 2025: in force, signed —Net Metering Guideline 2025

revokes or replaces amends overrides in part in force amended pending draft replaced revoked expired

  1. Net Metering Guidelines 2018 28 Jul 2018 replaced
    Net Metering Guidelines 2018
  2. Net Metering Guideline 2025 (this rule) — in force
    Net Metering Guideline 2025

Related rules in Bangladesh

Change log

  1. Added to the tracker.

Cite this entry

Net Metering Guideline 2025, “Net Metering Guideline 2025”. Ministry of Power, Energy and Mineral Resources (Power Division), Bangladesh, signed —. In: Power Transformation Lab Policy Tracker, status checked 19 Nov 2026. https://power-lab.github.io/policy-tracker/rules/bd-gl-2025-netmeter/