India · ministerial regulation · unnumbered (MNRE order of March 2026; number not confirmed)
Amendment to the ALMM Order introducing ALMM List-III for solar ingots and wafers
Amendment to ALMM Order for implementation of ALMM List-III for solar wafers
Summary
Extends the ALMM framework to wafers, requiring projects under the order, including net-metering and open access projects, to use wafers from ALMM List-III from 1 June 2028. Wafer makers seeking enlistment must also have matching ingot capacity, and the list is to be issued only once at least three independent wafer facilities with combined capacity of 15 GW are operating.
Reviewer notes: Scouted from desk research (medium confidence). Order reported on 2026-03-18 after a September 2025 draft; MNRE text not read. Status pending because the requirement applies from 2028-06-01. Reports differ on the grandfathering cut-off (seven days vs one month after the first wafer list); check. Title paraphrased.
History
All instruments linked to this one by amendment, revocation or partial override, in order of signature. Select an instrument to open its entry.
revokes or replaces amends overrides in part in force amended pending draft replaced revoked expired
-
Approved Models and Manufacturers of Solar Photovoltaic Modules (Requirements for Compulsory Registration) Order, 2019
-
Amendment to the ALMM Order for implementation of ALMM List-II for solar PV cellsAmends ALMM Order 2019.
-
ALMM List-III for ingots and wafers (this rule) Mar 2026 pendingAmendment to the ALMM Order introducing ALMM List-III for solar ingots and wafersAmends ALMM Order 2019.
Related rules in India
Change log
-
Added to the tracker.
Cite this entry
ALMM List-III for ingots and wafers, “Amendment to the ALMM Order introducing ALMM List-III for solar ingots and wafers”. Ministry of New and Renewable Energy, India, signed Mar 2026. In: Power Transformation Lab Policy Tracker, status checked 19 Nov 2026. https://power-lab.github.io/policy-tracker/rules/in-om-mnre-2026-almm-iii/