India · government regulation · S.O. 2920(E)

Solar Photovoltaics, Systems, Devices and Components Goods (Requirements for Compulsory Registration) Order, 2017

Solar Photovoltaics, Systems, Devices and Components Goods (Requirements for Compulsory Registration) Order, 2017

replaced unverified

Summary

Quality control order under the Bureau of Indian Standards framework requiring solar PV modules, inverters and storage batteries listed in its schedule to conform to Indian Standards and be registered with BIS before sale or import. Its commencement was deferred and staggered by product.

Not yet verified. This entry has not been fully checked against the official text. Confirm the status and links before relying on it.

Reviewer notes: Scouted from desk research (medium confidence). Number per later gazette notices; date cited as 2017-09-05 in most sources but one copy reads 30.8.2017. date_in_force 2018-04-16 applies to items 1-3 on self-certification per a 2018 amendment; other items later (September 2018). Products in the schedule summarised from general knowledge; check. Superseded by S.O. 492(E) of 2025-01-27.

History

All instruments linked to this one by amendment, revocation or partial override, in order of signature. Select an instrument to open its entry.

20172019202120232025Solar PV QCO 2017: replaced, signed 5 Sep 2017Solar PV QCO 2017Solar Systems QCO 2025: in force, signed 27 Jan 2025Solar Systems QCO 2025

revokes or replaces amends overrides in part in force amended pending draft replaced revoked expired

  1. Solar PV QCO 2017 (this rule) 5 Sep 2017 replaced
    Solar Photovoltaics, Systems, Devices and Components Goods (Requirements for Compulsory Registration) Order, 2017
  2. Solar Systems QCO 2025 27 Jan 2025 in force
    Solar Systems, Devices and Components Goods Order, 2025

Related rules in India

Change log

  1. Added to the tracker.

Cite this entry

Solar PV QCO 2017, “Solar Photovoltaics, Systems, Devices and Components Goods (Requirements for Compulsory Registration) Order, 2017”. Ministry of New and Renewable Energy, India, signed 5 Sep 2017. In: Power Transformation Lab Policy Tracker, status checked 19 Nov 2026. https://power-lab.github.io/policy-tracker/rules/in-so-2017-2920/