Thailand Power Development Plan 2018-2037 (PDP2018)

Thailand Power Development Plan 2018-2037 (PDP2018)

replaced unverified

Summary

The national power development plan for 2018-2037. It planned about 56 GW of new capacity, for 77,211 MW in total by 2037. It was replaced by PDP2018 Rev.1 in 2020.

Not yet verified. This entry has not been fully checked against the official text. Confirm the status and links before relying on it.

Reviewer notes: Scouted from desk research (high confidence). Thai title to be added. Approved at NEPC meeting 1/2562 on 24 Jan 2019 (EPPO resolutions portal). Cabinet approval reported in May 2019 (date not confirmed); date_in_force left empty until checked.

History

All instruments linked to this one by amendment, revocation or partial override, in order of signature. Select an instrument to open its entry.

201920202021PDP2018: replaced, signed 24 Jan 2019PDP2018PDP2018 Rev.1: in force, signed 19 Mar 2020PDP2018 Rev.1

revokes or replaces amends overrides in part in force amended pending draft replaced revoked expired

  1. PDP2018 (this rule) 24 Jan 2019 replaced
    Thailand Power Development Plan 2018-2037 (PDP2018)
  2. PDP2018 Rev.1 19 Mar 2020 in force
    Thailand Power Development Plan 2018-2037, Revision 1 (PDP2018 Rev.1)
    Revokes PDP2018.

Change log

  1. Added to the tracker.