Thailand · plan · PDP2018 Rev.1

Thailand Power Development Plan 2018-2037, Revision 1 (PDP2018 Rev.1)

Thailand Power Development Plan 2018-2037, Revision 1 (PDP2018 Rev.1)

in force unverified

Summary

Revision of PDP2018, considered by the NEPC in March 2020, and still the plan in force. It plans about 20,766 MW of renewables by 2037. The draft PDP2024 was never adopted, and the draft PDP2026 (2026-2050) went to public hearing on 8 Sep 2026.

Not yet verified. This entry has not been fully checked against the official text. Confirm the status and links before relying on it.

Reviewer notes: Scouted from desk research (high confidence). Thai title to be added. Considered at NEPC meeting 1/2563 (150) on 19 Mar 2020; IEA says published 2020. Renewables figure from Chambers 2026. Later Cabinet step not confirmed; date_in_force left empty. Link basis not checked against the text: the report says it amends or replaces the earlier row.

History

All instruments linked to this one by amendment, revocation or partial override, in order of signature. Select an instrument to open its entry.

201920202021PDP2018: replaced, signed 24 Jan 2019PDP2018PDP2018 Rev.1: in force, signed 19 Mar 2020PDP2018 Rev.1

revokes or replaces amends overrides in part in force amended pending draft replaced revoked expired

  1. PDP2018 24 Jan 2019 replaced
    Thailand Power Development Plan 2018-2037 (PDP2018)
  2. PDP2018 Rev.1 (this rule) 19 Mar 2020 in force
    Thailand Power Development Plan 2018-2037, Revision 1 (PDP2018 Rev.1)
    Revokes PDP2018.

Change log

  1. Added to the tracker.

Cite this entry

PDP2018 Rev.1, “Thailand Power Development Plan 2018-2037, Revision 1 (PDP2018 Rev.1)”. National Energy Policy Council (NEPC), Thailand, signed 19 Mar 2020. In: Power Transformation Lab Policy Tracker, status checked 4 Nov 2026. https://power-lab.github.io/policy-tracker/rules/th-plan-2020-pdp2018-rev1/